Diagram 21 Potential mitigation area requirements if 244m Turbines used throughout the East Anglia THREE site


16.7.2 NATS Cromer Radar 82.


Turbines higher than 20m above the contours depicted at Diagram 14 may be detected by NATS Cromer radar. As the Cromer radar LoS at the closest point of the East Anglia THREE site, being the North West corner, is 204m AMSL, this modelling supports the conclusion that the East Anglia THREE site could accommodate 220m turbines across the entire area and would require no further mitigation. If turbines larger than 220m are utilised, then technical mitigation may be required by NATS.


83. Diagram 25 is illustrative of the area of mitigation that may be required if 244m turbines are utilised. The area is effectively less than the LoS contours due to the reduced Pd.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Appendix 0 Example Page 24


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29