FLOORING


often need to keep disturbance to visitors, residents, or customers to a minimum. For example, when a floor needs to be raised by tens of millimetres, contractors may use a sand or cement screed to build up floor levels. This can take several days, or even several weeks, to dry out sufficiently for new floorcoverings to be installed. This will cause significant inconvenience for refurbishments of heavily used areas.


“SPECIALIST LEVELLING COMPOUNDS CAN


BE WALK-ON HARD IN 90 MINUTES.”


Levelling compounds have been purposefully designed to rapidly build-up floor levels, allowing contractors to finish jobs that previously would have taken days, in just a few hours. The best compounds will be applicable in thicknesses up to 50mm in a single application, and will be ready to receive new floorcoverings in as little as six hours. The most professional compounds will be self-levelling, and will leave a smooth, durable surface, ready for the application of floorcoverings directly.


Being able to apply floorcoverings after six hours, compared with


www.tomorrowsfm.com


several weeks is an enormous saving of time. When you take into account the fact that these specialist levelling compounds can be walk- on hard in 90 minutes, meaning the area can be worked on while the floor dries, the time savings on the entire job are phenomenal.


If a perfectly smooth surface is required, when installing resilient floorcoverings for instance, then a further levelling compound will be needed to ‘cap’ the deep base compound. For applications of 10mm and under, there are levelling compounds that have been specially designed to provide a perfectly smooth, level subfloor, ready to receive floorcoverings, in as little as 45 minutes. Walk-on times for the highest performing compounds of this sort can be just 30 minutes. A perfect floor finish can therefore be achieved in under an hour, which in turn means less time spent on-site, and less disruption to the facility in question.


CONCRETE PROMISE For maintenance workers looking


after large, high-traffic facilities, repairing damaged or worn concrete can be a difficult job. Concrete takes a long time to dry, even when applied at a few millimetre thicknesses to repair chipped or worn surfaces. When repairing a main staircase, for


example, even a few hours out of use can cause a significant inconvenience.


Manufacturers of specialist floor preparation products have utilised the latest in cement technology to create mortars purposefully designed to repair damaged or worn concrete in rapid time. These economical and easy-to-use repair mortars will be applicable up to 50mm, durable, and freeze- thaw resistant. High quality, high performance mortars will be walk- on hard in as little as one hour, allowing contractors to minimise the disturbance to a busy facility.


“ACHIEVING A


PERFECT FLOOR FINISH DEPENDS ON PROPER PREPARATION.”


Whatever the job, specialist flooring manufacturers can provide products that have been specifically designed to make things as easy and efficient as possible. For facilities managers with strict time constraints, it is vital that jobs are completed to the highest possible standard in the quickest possible time. Choosing the right products for the right circumstances could save a great deal of time, effort, and money.


www.setcrete.co.uk TOMORROW’S FM | 39


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72