WHAT’S NEW?
CONTRACT SUCCESS FOR FIRE AND SECURITY
MAINTENANCE Trinity Fire & Security Systems is increasing its presence at Heathrow Airport with two contracts covering maintenance and a replacement installation, worth in excess of £15 million. The fire, life safety and security systems specialist, which has its headquarters in Devon and a number of offices across the UK, is to provide a maintenance contract for Heathrow Airport Limited (HAL) over the next five years.
This is a renewal of a previous five- year contract to provide maintenance of fire and life safety systems for five HAL business units; Terminal 1, Terminal 3, landside properties, airside properties and HEX. In addition, Trinity will also now be providing maintenance for Terminal 4.
Part of the success of this bid can be attributed to Trinity’s response to Heathrow’s sustainability drive through a commitment to using electric vehicles within its business fleet.
While the initial contract supported fire alarms, public address voice alarm (PAVA) systems, fire extinguishers, hose reels, gas detection and suppression systems, smoke ventilation and stair pressurisation systems, the new contract includes maintenance of sprinklers, dry and wet risers, fire dampers, foam suppression systems and water mist suppression systems.
To meet the additional demands of the contracts, Trinity has recruited 22 extra team members with the required skills, and, as part of ongoing training and development, existing engineers were upskilled in time for the start of the contract in January 2016.
The second of the contracts saw Trinity awarded a £6.5 million contract for the replacement of the fire and PAVA systems at Terminal 3.
Trinity Director, Adam Davies, who leads the Heathrow team from its dedicated office at the airport, said:
12 | TOMORROW’S FM
“We are delighted to have been awarded these contracts, which enable us to build on the success of our first five years at Heathrow. During this time, we have shown our commitment to the highest level of
service; safety issues can potentially affect people’s lives and it’s crucial that we achieve the right solution and standard every time.”
www.trinityfireandsecurity.com
twitter.com/TomorrowsFM
PMP RECRUITMENT SECURES WEETABIX
SUPPLIER AWARD PMP Recruitment, part of Cordant Group and the chief supplier of agency staff to Weetabix’s production facilities in the UK, has won the company’s Service Award. Weetabix’s annual Procurement Supplier Awards are designed to celebrate the achievements of the brand’s standout suppliers across a number of different categories.
PMP Recruitment has supplied a
temporary workforce at Weetabix’s two Northamptonshire-based plants in Burton Latimer and Corby since June 2014. The company supplies Weetabix with between 80 and 100 production staff on a constant basis and also has a pool of agency staff in reserve that can quickly supplement the existing workforce when required. Since working alongside Weetabix, PMP Recruitment has hit 100% of its KPI targets, which covers various criteria relating to compliance, absence rates, response times and aptitude of staff.
Catherine Lund, Strategic Sourcing Manager, Weetabix, said: “PMP
Recruitment’s record has been 100%, ensuring continuous supply throughout the year and coping with the demand challenges from Weetabix in a consistent and proactive way. This award is well deserved and we congratulate the PMP team.”
Gordon Mitchell, Account Director,
PMP Recruitment, said: “Since securing the contract, we have made a significant impact to the operation, transforming the way recruitment services are managed and delivered on-site. We are very proud winners of the Service Award and we look forward to continuing our excellent partnership with the Weetabix team.”
www.pmprecruitment.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60