TECH SPOTLIGHT JAMES FISHER SUBSEA EXCAVATION DESIGNS TWIN T8000 FOR LARGE DIAMETER TRENCHING IN RESPONSE TO ITS CLIENT’S NEEDS


JFSE developed the innovative Twin T8000 to respond to SapuraKencana Mexicana’s large diameter trenching need. The Twin T8000 is the only M/CFE tool capable of trenching pipelines of more than 60” in a single pass. With a maximum volume output of 16,000 litres per second, the Twin T8000 is the most powerful M/CFE in the world. The technology will now be deployed globally.


Subsea excavation experts at James Fisher Subsea Excavation (JFSE) – the leading mass/ controlled flow excavation (M/CfE) company - have developed the world’s most powerful M/CFE tool capable of trenching large diameter pipelines in a single pass.


The Twin T8000 was developed to support SapuraKencana Mexicana’s trenching requirements. The offshore construction company needed more than 14km of a 36” pipeline with concrete coating to be trenched one metre on top of the pipe.


The tool was developed utilising JfSE’s patented T8000 technology which has been responsible for the successful completion of hundreds of subsea excavation projects worldwide over the past 19 years. JFSE engineers created a solution which combined immense power with precision controllability by bringing two units together and developing the existing technology further.


The Twin T8000 has a total maximum output of 16,000 litres per second and had to achieve 0mm + 300mm accuracy of trench on this project. There were 15 crossings to negotiate.


Tomas Valdes Aldama, Technical Engineer at SapuraKencana Mexicana, said:


“We were impressed by the professionalism, innovation and commitment to delivering great results demonstrated by the JFSE team.


“Due to there being a tight window, we required this pipeline to be trenched in a single pass.


“The results from the Twin T8000’s inaugural project have been great and it is certainly a technology we will consider utilising again in the future.”


The Twin T8000 equipment spread was p48 | www.sosmagazine.biz | March 2017


mobilised on board the offshore supply vessel, Ocean Carrier, in the Gulf of Mexico as part of SapuraKencana Mexicana’s contract for the procurement and construction of a sour gas pipeline for Pemex covering five fields.


Graham Murdoch, Technical Director at JfSE, explained:


“Although we designed the Twin T8000 with this particular project in mind, the technology will greatly benefit clients with large diameter trenching needs. The proven combination of power and controllability of this tool is second to none.


“JFSE is proud to be a true partner to our clients, providing a trusted and innovative service. This maiden project for the Twin T8000 for SapuraKencana Mexicana perfectly illustrates that mutual trust and respect.


“We look forward to rolling out this technology worldwide to support more clients.”


JfSE’s fleet of tools provides a non-contact form of excavation that eliminates the risks associated with other excavation methods especially around complex subsea assets. further enhancing their capabilities, the tools have the additional benefit of real- time sonar imaging which enables precision excavation in confined areas, as well as for all cable or pipeline scopes from 1” through to more than 60” scopes. The tools are used for applications including pipeline and cable trenching, deburial, rock dump dispersal


and seabed clearance and preparations. The M/CFE spreads are ideal for moving materials such as sand, silt and mud, drill cuttings, clay and rock dump.


JfSE’s fleet includes 30 M/CfEs and experts at the company, who are responsible for the successful completion of almost 450 projects over a period of 19 years, are currently developing two further excavators which will be launched to the market in 2017.


Graham Murdoch added:


“Our fleet is market-leading in providing proven results for our clients. As well as our established world-class solutions, we are committed to continuously innovating so our clients can be assured that whatever M/CFE solution we devise for their subsea excavation requirement, it will be the most time and cost-effective one available.”


With strategic hubs in the UK, UAE, Singapore, Venezuela, USA, Brazil, South Africa, China and Mexico and tools based in five continents, it is the only M/CFE company capable of working on multiple projects simultaneously. As part of the James fisher group, JfSE has access to bases and sister company expertise in more than 40 countries worldwide.


www.jfsubseaexcavation.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52