This page contains a Flash digital edition of a book.
OF INTEREST


Plane Sailing at RAF Marham By Melanie Pattenden


The recent opening of the new playground and skate park was a great success at RAF Marham – Oak Avenue Play Park. The park was officially opened on the by Air Vice-Marshal Gary MWaterfall CBE RAF and children from the local schools came to try out the new play area. Although arather grey day the equipment stood out with vibrant coloured units and colourful safety surfacing on the floor.


The children enjoyed playing on the colourful pirate ship, steering the boat into more sunny seas while others enjoyed sliding down the duel slide or climbing up sky high on the other adventure play unit. Encouraging development through play has always been afocus for playground equipment company Monster Play@Caloo.


Working with RAF Marham the main aim was to completely refurbish the current site and install large play units that could accommodate lots of children and enhance their imaginations through play.Itwas a


48 Autumn 2016


priority that at least one unit could accommodate Wheelchair users to make play accessible for all within the refurbishment. New fencing was required around the site and the existing play area was to be converted into aseparate Skate Park aimed at Teenagers, making sure equipment provided was for all age groups.


An assortment of equipment was installed including two fantastic adventure play units, the ‘Oakley Estates Supermax’ aimed at older children containing 11 activity areas including aduel slide, net climber and rope ladder and alongside, the ‘Clipper Pirate Ship’ for younger children with 14 activity areas with ships wheel, climbing ramp, fireman’s pole and OXO game. These two units are Gold Award products for encouraging communication, sensory, physical and cognitive skills through play.All Monster Play equipment has been rated by leading Childhood Development expert Dr A.Gummer, against the National Curriculum, meeting developmental and skills requirements for children.


Cradle and flat swings, Rock NCross see-saws, an accessible whirl and a new skate park were also installed to provide additional and more traditional opportunities for play. Completion time only took four weeks which also included laying new safety surfacing around each piece of equipment alongside furniture and fencing for the whole site.


The project was acomplete success and the client was very pleased with the final outcome. The community now has apublic space to visit daily, children can develop and learn across all areas of the play equipment enabling them to enjoy and explore new apparatus as they grow. 


raf-ff.org.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60