This page contains a Flash digital edition of a book.
  when it will have a total length  the wastewater treatment plant in Deusen, a district in Dortmund, to the confluence of the Emscher and the Rhine at Dinslaken. Total investments amount to     been built up to now,” said the water management association Emschergenossenschaft. Further impressive figures in connection with the Emscher     pipes are made of reinforced concrete. The gradient at these  metres per kilometre, with a  km/h.


The aim of this large-  wastewater to its treatment plants via underground pipes.  on the surface can be free from wastewater and can be redesigned in a way that is close to nature,” says the water management association.


 treatment plants


 wastewater without including the entire wastewater system, and indeed not merely the wastewater pipes, but also the pipes within a sewage plant. Raw sludge, for instance, is pumped into a digestor which is several metres high. The digestion tower has a screening drum – a large pipe with numerous openings for sewage intake. Further  wastewater from the aeration tank into the clarifier where the slurry is separates from the water under the force of gravity. Next, the sludge is taken back to the aeration tank via further pipes.


The purified water can then flow back into a small or large river if there is one – obviously via a canal.


Water is conveyed as steam Wastewater treatment plants  These include rainwater overflow basins, rainwater retention basins and retention soil filters. After or during a heavy rain the water intake capacity and cleaning capacity of the plant  this from happening, a rainwater overflow basin is built outside the plant with the purpose of providing interim storage for  water management association  hand, a rainwater retention basin can be used for the short-term storage of large water volumes  in the form of steam. The water rushes into the basin within a short period of time, is collected and is then gradually released into the body of water via a choke, i.e. a relatively small pipe.” This avoids surge flushes, says the association, and thus harm to wildlife in the body of water.


EU standards cause pressure to act


Many European countries are now under pressure to act, particularly in Eastern Europe.  facilities must meet EU


standards. This means expanding and modernising existing wastewater treatment plants as well as building new ones. Also, money has to be invested in expanding sewer systems. So, as we can see, the demand for pipes is clearly as strong as ever.


Press Contact 2016:


Petra Hartmann-Bresgen M.A. Ulrike Osahon Tel.: +49 (0)211/4560-541/-992 Fax: +49 (0)211/4560-87 541 E-Mail: HartmannP@messe- duesseldorf.de


Tube Accessories Profiles


Plastic Tube Forum


join the best: 4-8 April 2016


EXHIBITIONS Düsseldorf, Germany I www.tube.de


join the best — welcome to the world’s leading trade fair for the tube industry! Those who wish to find comprehensive informa- tion about the latest innovations in tubes and pipes, manufacturing, processing machinery and tube accessories need look no further. It can all be found here at the world’s most important exhibition — the meeting point for international experts, specialists and global market leaders. Special focal point at Tube 2016: Plastic tubes. A special area is reserved for them, because the question of ma- terials is becoming more and more important.


An important fixed date in your calendar — your visit to Tube 2016 in Düsseldorf!


International Tube and Pipe Trade Fair Internationale Rohr-Fachmesse


Plant and Machinery


Pipe and Tube Processing Machinery


Bending and Forming Technology


Tube


Manufacturing and Trading


Messe Düsseldorf GmbH P.O. Box 10 10 06 – 40001 Düsseldorf – Germany www.internationalmetaltube.com


Tel. +49 (0)2 11/45 60-01 – Fax +49 (0)2 11/45 60-6 68 www.messe-duesseldorf.de


IMT March 2016 31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36