COMPANY PROFILE


COMMITMENT TO SAFETY SSOWF is fully committed to meeting its responsibility for safety and complies closely with the Health and Safety at Work Act 1974 and the Management of Health and Safety Regulations 1999.


ADVANCED MEDICAL CARE Since the wind farm became operational, the company has become increasingly aware that there would be a significant risk of being unable to administer advanced medical care in the face of injury, due to the remote location of the wind farm.


Anticipated response times would be 40 minutes to 1½ hours from local life boats and SAR helicopters.


COMPANY’S ROLE


Leo Hambro from Tidal Transit explains his company’s role in SSOWF’s enhanced safety procedures.


“All three of Tidal Transit’s passenger transfer vessels are under contract to SSOWF, sailing to the wind farm on most days from either Wells-next-the-Sea or Great Yarmouth to transfer wind farm maintenance technicians and their tools.


“Having reached the conclusion that the First Aid at Work qualification – the industry standard required of all wind farm personnel – was inadequate for the best chance of survival in the event of major trauma, SSOWF has chosen to employ medics in the field with a minimum of FPOS intermediate level training and experience in similar arenas.


PROVEN BENEFITS


“This practice has brought proven benefits to safety procedures, and when SSOWF decided to expand the employment of suitably qualified medical staff, Tidal Transit was happy to support this important safety initiative. Tidal Transit now provides first responders as part of its regular crews, which affords an even faster medical response, and will provide SSOWF with a long term and sustainable solution to Health and Safety.”


TIDAL TRANSIT VESSELS


The specification of these vessels greatly exceeds the current fleet being used for the same purpose in the UK. The vessels MCA Cat 1 coding and 10,000 litre fuel tanks allow them to work up to 150 miles offshore, well within the range of the UK’s forthcoming Round 3 offshore wind farms. Each vessel provides four crew members and twelve passengers with comfortable beds, bathrooms, galley, internet access and entertainment facilities, allowing wind farm engineers and support technicians to live and work offshore for up to several days at a time.


Tidal Transit Limited


Click to view more info = Click to view video 1


= Click to view video 2


RUGGED GRP CONSTRUCTION Being of rugged GRP construction enables Tidal Transit’s vessels to operate in rough seas – a major advantage when working in the North Sea. Twin V12 MAN engines facilitate speeds of up to 27 knots when carrying twelve passengers, the crew, and their on-board cargo.


www.windenergynetwork.co.uk


51


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116