This page contains a Flash digital edition of a book.
INDUSTRY NEWS


GLOBAL CHAMPION


AREVA accelerates its development by creating a European champion with GAMESA to become a leading global player.


Recently AREVA and GAMESA announced the entry into exclusive negotiations to create a 50/50 joint-venture company in the field of offshore wind power.


The offshore market represents one of the most promising areas for the development of renewable energies, particularly in the coastal countries of northern Europe, where the installed base should reach over 25 GW by 2020, and in Asia.


GLOBAL LEADING PLAYERS


By joining forces, AREVA and GAMESA will enable the JV to become one of the leading players in the global offshore wind market, contributing to the development of this growing sector through…


• Expertise, innovation and investments in R&D to develop competitive and reliable technologies of the future


• Industrialisation capacity and expertise in the development of a supply chain, both internal and external


• Application of efficient onshore practices into offshore activities


SIGNIFICANT SYNERGY


This JV will benefit from significant synergies… • On the one hand, the experience gained by AREVA since 2004 across several wind projects, notably through the ongoing installation of 120 5 MW turbines in the North Sea


• On the other hand, GAMESA’s comprehensive technological capabilities in onshore and offshore, leveraged on its 19 years leading track-record in the industry throughout the wind value chain. The company also has a strong capacity for industrialisation, based on its proven knowledge and experience supply chain development.


POOLING PERSONNEL & TECHNOLOGY AREVA and GAMESA will pool personnel and offshore wind related technologies and assets to the JV…


• For AREVA, the German Bremerhaven (turbine assembly) and Stade (blade manufacturing) plants, as well as offshore wind technology and commercial contracts


• For GAMESA, existing multi-megawatt technologies applicable to offshore, the 5 MW platform and Arinaga turbine prototype, as well as offshore related engineering, operation and maintenance capabilities


• Additionally, the JV will enter into a preferred supplier agreement with GAMESA for some key components


BEST-IN-CLASS


The JV will develop a best-in-class product portfolio aimed at covering offshore market needs…


• 5 MW – the JV will continue to market AREVA’s M5000 turbine, which benefits from a strong track-record. Moreover, an enhanced 5 MW generation turbine will be developed in the short-term benefiting from the full potential of GAMESA’s multi-megawatt cutting edge technologies


• 8 MW – acceleration in the development of the next generation of turbines, benefiting from investment efforts undertaken to date by both parties and from the technological synergies of the JV


CLIENT CONFIDENCE


From its launch, the JV will enjoy the confidence of numerous customers, including Iberdrola*, which selected the M5000 turbine for its offshore farms near Saint-Brieuc in France, and Wilkinger in Germany.


The JV will fulfill existing industrial development commitments both in the UK and France, that have up until now been led by AREVA, which notably include the creation of a turbine assembly and blades manufacturing plants at Le Havre and the implementation of a network of sub-contractors and partners.


CONSOLIDATION


“By choosing to create a European offshore wind champion with GAMESA, AREVA is playing a key role in the consolidation, already underway, of the offshore wind sector, and confirms its long-term commitment to renewable energies,” declared Luc Oursel, President and CEO of AREVA.


12


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116