This page contains a Flash digital edition of a book.
oolsHotWorks


with possible river-facing restaurant at ground level, the building is being demolished using top-down methods. Three mini excavators and a skid steer loader are gradually eating the building down to a level at which it can be tackled using a high reach excavator.


IFIT'SGOODENOUGHFOR THESQUIBBGROUP...


But the arrival of the 350 kg Italmek IC3.5 shear, which is suitable for carriers in the three to five tonne operating weight class, has made a significant impact upon the productivity and safety of the rebar cutting process.


EQUIPMENTTHE GROUPHAS


BOUGHTINA LONGTIME”


SITEMANAGER LEWISDAVIS “BESTPIECEOF


Worsley Plant Ltd Road Beta · Brooks Lane Industrial Estate ·Middlewich · Cheshire CW10 0QF 01606 835544 · info@worsleyplant.co.uk ·www.worsleyplant.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60