RENOVATIONS SNAPSHOT
As the end of the cricket season fast approaches, what are groundsmen up and down the UK - from Aberdeen to Jersey - planning? We take a snapshot of the work to be carried out, from county and outgrounds, to schools and club sides
Taunton School
Head Groundsman: Mark Jolliffe
Number of staff: Six.
Number of pitches and brief details: 5 squares and 4 grass nets (58 pitches). 54 of which are Surrey loam and 4 Ongar loam.
Time constraints: After the last game on 15th August, and before end of September (weather permitting).
Proposed programme: Shave down all squares to 3mm, scarify to 5mm depth in at least 3 directions and collect arisings, irrigate square if necessary to soften surface and run variseeder (empty) over squares in 3 directions to create thousands of holes before 2 more passes seeding at 35-40g/m.sq., apply fertiliser at 35g/m.sq., and, finally, topdress with compatible loam (approximately. 200kg per pitch). Brush and dragmat all squares to rub in materials. Fence off squares and irrigate when necessary.
Machinery used: Paladin fine cut mowers, Graden ‘swing wing’ tractor mounted scarifier, Kubota ride-on rotary (to clear arisings), Sisis tractor mounted variseeder, Charterhouse Rink 1010 trailed topdresser, pedestrian fertiliser distributor, John Deere 4500 tractor to do overseeding and topdressing, fork lift truck to move pallets of loam, 2 tonne trailer.
Manpower: All work done in-house.
Aims and objectives: To carry out the works as planned, efficiently, professionally and on time. Objective is to recover surface levels and grass coverage.
Effects of Recession: None at the present time.
States of Jersey Head Groundsman: Steve Landick
Number of staff: 24 (not all will be involved with the pitch renovation work, 11 at the most, with a head groundsman at each location).
Number of pitches and brief details: 5 cricket squares, all but one with an artificial Notts Turf wicket on the end of the square. All cricket squares are on the natural sandy/loam soil, except for two which have been constructed on sand dune and one on a heavier soil after a playing field was cut and filled.
Time constraints:Weather and preparing winter games pitches for the weeks to come.
86
Aberdeenshire Cricket Club Head Groundsman: Ken McCurdie Number of staff: One (part-time in season)
Number of pitches and brief details: Cricket Ground with 14 pitches. Typical cricket square construction.
Time constraints: Being in Aberdeen it is vital that renovations are completed as early as possible whilst soil temperatures are conducive to germination and growth.
Proposed programme: Cut to 8mm, scarify to 6mm in 4 directions, overseed, pre-seed fertilise, topdress, restore levels and irrigate. Solid tining will be carried out once the square is soft enough. Autumn/Winter will be applied at a later date. 120 bags of topdressing plus another 20 or so for levelling, 3 bags of grass seed, 1 bag of root enhancer, 2 bags of fertiliser. Proven effective over the last 17
Kenilworth Wardens Cricket Club
Head Groundsman: Geoff Calcott
Number of staff: One contractor (me) plus one helper
plus 3 new pitches. 3rdXI/4thXI Square: 5 Kaloam pitches plus 2 new pitches.
Time constraints: Main Autumn work to be completed by end of September.
Proposed programme: Deep spiking at monthly intervals to differing depths from October to January, ground conditions permitting. Application of liquid worm controller - early September. Power
Proposed programme: Each square will be watered heavily. Footmarks forked and keyed in with loam. No forking of ends takes place as this increases height of ends. Sisis 600 and Dennis scarifier used to remove surface material. Square will be double cut, and at the same height as if it was a wicket. Seeding of the whole square with a general cricket square mix at 35 g/m sq (mixture of ryegrass cultivars). A specified Surrey Loam with a minimum of 28% clay content is applied to the whole square up to 5 feet behind the stumps. Loam is then luted and worked into the surface ensuring existing levels are maintained. Groundsman spiker with solid tines later, once seed has germinated and square has been well wetted
by the autumn rain.
Machinery used: Sisis 600 rotorake, Dennis FT Mower with brush & scarifier cassettes, Cyclone seeder, Muck Truck, BLEC Seeder and a number of lutes/rakes/shovels. Groundsman spiker with solid tines.
Manpower: All work will be carried out in-house, no outside contractors will be used.
Aims and objectives: To be as quick and as careful to complete all the operations within a period of good weather. Completing the work as soon after the cricket season finishes, therefore giving the renovation work maximum chance of a good recovery.
Number of pitches and brief details: Two grass squares. Main Square: 12 Kaloam pitches
years. Approximately £1300 including the rental of a tractor mounted scarifier.
Machinery used: Allett 42” mower, Sisis TM 1000 scarifier, Cyclone spreader, Meter- Matic topdresser, 3 metre Levelute.
Manpower: All in-house.
Aims and objectives: To achieve a thatch-free profile with good, healthy grass cover and root development.
Effects of Recession: None, at the moment.
scarification with Graden in 3 directions plus pick up of resultant debris. Overseed with 2 x 25kgs dwarf perennial ryegrass (mixture of 3 cultivars). Application of 2 x 25kgs Autumn/Winter fertiliser. Topdress with 7-8 x 25kgs bags of Kaloam per pitch. Deep spiking to 100-125mm depth at 50mm centres with Groundsman spiker at monthly intervals from late October to end January - ground conditions permitting.
Machinery used: Graden scarifier, Groundsman deep spiker, Pedestrian Walkover sprayer.
Manpower: None - except me and my helper! Effects of Recession: None, at the moment.
Other comments: Sorry, cannot tell you my prices individually but you wouldn’t get much change out of £110-£120 per pitch for the main autumn renovation. Deep spiking is around £80 per session for an average 10-12 pitch square.
Effects of Recession: No cut backs as such but less money available for materials and machinery, therefore one has to be more conservative on their use.
Other comments: Surrey Loam is preferred because it has been used over the years. Therefore, we keep consistency by continuing to use it. Cost per tonne is around £180. We use between 3 to 5 tonne per square according to square size. Mascot R9 grass seed will be used this year. This is a mixture of four cultivars - Ace, Sauvignon, Greenflash and Greenway. Investment in good quality materials is very important. If budgets are continuously cut then the quality of the products could have an effect on the playing surface.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138