Product Report
Garmendale’s automated ride gates
nullarmendale Engineering
ITnullS full steam ahead for nullramendale Ennullineerinnullnull
the family nullusiness nullased in Ilkestonnull Unullnull which is
hopinnull that the current level of work is a sinulln of
not only a nulletter season for many of the parks nullut
a positive turn in the nulleneral economy at lastnull
o
r
null
null
e
p
o
r
t
Since his appointnnull t as sales director in nullarch, Shaun
nullnullnullrien has been busy identifying the strengths of the
business and how they will play a part in the longnullternull
growth of nullrannull dalenull enull are nullery wellnullknown in the
Unull for our ability to react to a telephone call on a nullriday
c
null
null
e
p
nullrning asking for a teanull to be on site that afternoon to
nullake a repair to a ride so that it is up and running for the
weekend, and this will always be the casenull
enull see this as a win, win for all parties concerned
nullnullhe part of our business that the parks do not see is that
as it allows our clients to work with nullust one conullpany in
since nullnullnullnull we hanulle been nullanufacturing top nulluality people
producing a uninullue nulluality ride,null said nullnullnullriennull nullhe ride is
null
r
o
null
u
null er systenulls for the industrynull it nullust doesnnullt always appear
guided by a sinullple reflectinulle tape and can be installed as a
on site with the nullrannull dale brand on itnull Although our ride
pernullanent ride or as a nullbile unit to be used in shopping
installation and refurbishnnull t work will always be nullery
nullalls or any location with a flat, solid surfacenull
inullportant to us, itnulls ti null for nullrannull dale to be recognised
nullo acconullnulldate the current factory workload, which
around the globe for the nulluality ride systenulls we producenullnull
includes two ride gate systenulls, a coaster refurbishnnull t
P
r
o
d
u
c
t
nullhe latest ride, due for installation next nullarch, is an
pronullect, as well as the new dark ride, nullarnnull dale has nullust
autonullated guided nullehicle nullAnullVnull dark ride, which is being
null ed into a new nullnull,nullnullnullsnullnullft additional workshopnull Shortly
built in connullunction with thenulling conullpany nullnull nullecoratinulles,
also to null e is the adnullinistration and design engineering
also based in the Unullnull
departnnull ts to new purposenullbuilt ofenull s on the sitenull
nullirector nullanullid Shelrnull dine saidnull enull hanulle been
Garmendale’s installation Engineers working through the night
waiting for the right ti null to nullake this null e to show our
intention to beco null a nullanullor player in the industrynull nullirst
inullpressions count and the innullestnnull t we hanulle nullade in the
inullpronullennull t of our work place will certainly reward us in
the long ternull and be of huge benenullt to our clients who we
like to work nullery closely withnull In addition to the production
work we are also busy with our site sernullices teanulls on two
nullanullor attractions based in London and one in Surrey, so it is
inullportant that our pronullect nullanagers hanulle the nullst upnulltonull
date facilities to ensure all pronullects are conullpleted on tinull
and in budgetnullnull
nullarnnull dale has also taken on the nullarketing of the
nullanullperla nullPeople Expressnull road train within the Unull and
Ireland and is now planning to stock spares for so null of the
nullanullperla range for its Unull clientsnull nullhe conullpany will also be
nullaking its debut at the IAAPA Attractions Expo this year in
Las Vegas, on booth nullnullnullnull
42
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68