This page contains a Flash digital edition of a book.
Contents


NEWS 6 News


Heat pump industry calls for RHI certainty; 80% carbon target ‘technically possible’; Gaia architect Howard Liddell dies; DECC ordered to pay £180,000 FiT legal bill


12 CIBSE News Journal and Knowledge Portal voted two of the top benefi ts; commission module goes live on web; have bursary, will travel: Dale applications open


OPINION


16 Letters Calculated performance; overstating the case?


17 Regulations


Making European construction standards mandatory


18 Designing reality


Why Passivhaus might not be all it’s cracked up to be


20 Opportunity costs


Using BIM will – and should – increase design costs


Features 22 Going for broke


Highlights from Ecobuild, the largest eco show on earth


26 COVER FEATURE New frontier


Aecom reveals the secrets behind Halley VI, the new modular pod housing the British Antarctic Survey’s laboratories


32 BIM, biomass and Joanna Lumley Ecobuild from a different perspective


34 Data input A new approach to data centre effi ciency 39 Little and often


Researchers crank up the heat on tankless water heater effi ciency


PEOPLE AND JOBS


56 Appointments Jobs at jobs.cibsejournal.com


58 Looking ahead


Greenbuild EXPO 2013, plus industry- based conferences and training


Read the Schools and


Education Special with this issue and online at www.cibsejournal.com


www.cibsejournal.com


‘We don’t have a snowball’s chance in hell of hitting the UK’s carbon reduction target by 2050’ Page 22


April 2013 CIBSE Journal 3


LEARNING 47 CPD


Air source VRF systems for fl exible room heating and cooling, heat recovery and hydronic heating


CLASSIFIED 51 Products


A round-up of gadgets and services for the industry


55 Directory A guide to suppliers 22


April 2013 www.cibsejournal.com


EXAMINATION PROGRESS


IN


BDP puts Irish school under the microscope in bid to understand performance gap


SCHOOLS AND EDUCATION SPECIAL


THE BAUHAUS SCHOOL Skanska pilots energy performance contract on listed college refurbishment


In association with DRAUGHT EXCLUDER


New guidelines in Priority School Building Programme tackle wasteful ventilation


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60