[ GOVERNMENT ] SonomaCountyWateRAgency | Santa Rosa, Calif.


›› Retrofit Team MECHANICAL ENGINEER: Meline Engineering, Sacramento, Calif., meline.com GEOTHERMAL DRILLING CONTRACTOR: Air Connection, Santa Rosa, www.acconnections.com GEOTHERMAL HEAT-PUMP SYSTEMS AND CONTROLS INSTALLER: Bell Products, Napa, Calif., bellproducts.com


›› Materials


A 60-ton geothermal ground-source heat-pump system was installed at the site, including the following components:  Nine Tranquility Rooftop Series units with modulating economizers  One Tranquility 27 Two-Stage Series horizontal unit  One Tranquility 20 Single-Stage Series horizontal unit


Manufacturer: ClimateMaster, www.climatemaster.com


The geothermal system is installed in a field of 32 400-foot-deep boreholes next to the agency’s building under a parking lot. In addition, exhaust fans were incorporated for warehouse ventilation, along with a building-management control system to monitor and optimize HVAC system performance.


›› The Retrofit In March 2011, the water agency’s board of directors approved an official energy policy, which outlines the pursuit of a net-carbon-neutral power supply by 2015. Extending this mission into its internal operations, the water agency sought an efficient and renewable-energy HVAC solution as part of a renovation project at its 1315 Airport Boulevard office building. The 20,578-square-foot building, originally constructed in 1990, was modified in 2010 to house the agency’s maintenance and operations facilities. A section of the building that had previously been used for warehousing was remodeled into office space, which required extension of the HVAC system into that area. The building’s existing 51-ton HVAC system, which included nine packaged gas-electric rooftop units of various sizes, would have required additional equipment to support the renovations. With assistance from Meline Engineering, the water agency designed a retrofit geothermal heat-pump system that supplies 100 percent of the building’s heating and cooling load, eliminating need for natural gas. The system, which was overseen and partially executed by the water agency, officially went online in September 2011. “We’re expecting to save approximately 173,000 kilowatt hours annually in heating and cool- ing energy with the geothermal heat-pump system,” says Cordel Stillman, Sonoma County Water Agency’s deputy chief engineer. “This would result in offsetting approximately 75,000 pounds of greenhouse-gas emissions per year. We’re definitely interested in seeing how we can execute similar projects for the future.”


View a video about Sonoma County Water


Agency’s Energy-effi ciency Program at retrofi tmagazine.com.


New York Power Authority |White Plains, N.Y.


›› Retrofit Team GENERAL CONTRACTOR: Scully Construction, White Plains, www.scullycorp.com


›› Materials


Attic Armor insulation, which features Gas Filled Panel technology, multiple, honeycombed layers of thin, low-E metalized aluminum, was installed in the building. The baffled polymer chambers are enveloped by a sealed barrier and filled with argon gas, in this project’s case. The product expands to 11/2-inch thick at the jobsite to provide thermal resistance, flammability protection, and properties to contain air or a low-conductivity inert gas.


Manufacturer: Fi-Foil Co. Inc., www.gfpinsulation.com


›› The Retrofit Thirteen floors of the office building were retrofitted with GFP insulation panels on exterior walls, be- hind steam radiators and in plenums above drop ceilings. Four to six GFP panels—each with an R-value of 6.4—were installed per section with RBI Shield Facing and insulation anchors added to the existing 2 inches of foil-faced fiberglass. The total assembly provides an R-value of 24.2. The project, which was completed in 2011, meets an objective to make the LEED Gold building


even more sustainable. 30 RETROFIT // January-February 2013


PHOTOS: FI-FOIL CO. INC.


PHOTO: ART & CLARITY


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68