Adiabatic Air Inlet Cooling
Improving the performance of Air Cooled Chillers, Dry Coolers and Condensers and Refrigeration Plants. EcoMESH is a unique mesh and water spray system that improves performance, reduces energy consumption, eliminates high ambient problems, is virtually maintenance free and can payback in one cooling season.
Standard Installation
EcoMESH Addition
Water Spray
Cooler Air Intake
Powerseat Why you should install the EcoMESH system?
• Reduced Running Cost • Reduced Maintenance • Easy Retrofi t • Improved Reliability • Increased Capacity • Self Cleaning Filter • Shading Benefi t • No Water Treatment • Longer Compressor Life
EcoMESH Adiabatic Systems Ltd Tel: +44 (0)1733 244224 E-mail:
info@ecomesh.eu www.ecomesh.eu
®
saves money cuts electricity and carbon costs Solenoid gas shut-off valve
Lower capital cost of solenoid type valve is offset by high running costs, making the solenoid valve more expensive in the long run
Powerseat electro-hydraulic gas shut-off valve
Powerseat consumes just a fraction of the energy required by a solenoid type valve – reducing energy costs and carbon emissions. Meaning that initial capital outlay can be recouped in less than two years
Time Payback in less than 2 years
www.powerseat.co.uk www.blackteknigas.com | 01480 407074
Retro t boilers with axial air ow burners and reduce the costs of steam and heat
Retro tting an axial air ow burner to an existing steam boiler will signi cantly raise operating ef ciency and deliver a resulting
decrease in fuel consumption and energy costs. Axial air ow burners ensure:
• improved turndown range (key to fuel economy)
• reduced excess oxygen levels across turndown range
• lower fuel consumption • inherently low NOx
17 inch touchscreen provides a exible and fast control and command facility.
Fuel changeover can be performed quickly and safely.
Triple fuel axial air ow burner with simultaneous ring capability
Dunphy design, manufacture, install and maintain plant for all types of building steam and heat services, CHP and district heating.
For further information, or to arrange a combustion engineering audit, contact
sharon.kuligowski@dunphy.co.uk 01706 649217
www.cibsejournal.com January 2013 CIBSE Journal 21
Cost
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84