Calverton fish farm
The Welsh Beaver project
River restoration 36 14 34
Contents
Industry News and Views Lord Deben - Chair CCC
Prof Peter Matthews - Chair Welsh Natural Resources New Head for Defra
No More SuDS delays - Alex Stephenson Flood Defence
Preventing flooding from within - Andy Hirst Paint-on flood protection - John Alexander Upton’s Glass flood protection - Ray Moulds
Stormwater Drainage Happy Valley Racecourse - Cheryl Chan Feature Section Channel Maintenance & Management
Channel Restoration Introduction - Antonia Scarr
The River Restoration Centre - Nick Elbourne RESTORE - Antonia Scarr
The River Wensum Restoration - Amy Capon Fleet Pond Restoration scheme - Damian McGettrick
Dredging & De-silting Silt removal on the Ouse - Chris Skulski Bank Stabilisation & Repair
Repairing an undercutting river bank - Richard Edwards Preventing sediment damage during repair - David Poole Bioengineering, Innovations & Developments - Mike Cooper Erosion control through bio-engineering - David Holland
Vegetation Maintenance The latest in aquatic weed boats - Chris Pett Water Level Management
Weedscreens and hydro schemes - Mike Humphrey Duel purpose pumps for Kempsey - Lucy Ogden The Welsh Beaver Project - Adrian Lloyd Jones New fish passes on the Derwent
Conservation & the Environment Calverton Fish Farm - Alan Henshaw Droughts damaging river life
Endangered newts & rare dragonflies An American Invasion - Crayfish
RRC Annual Network Conference 30
32 - 35 32
32 - 33 34 - 35 35
36 - 39 36 - 38 38
38 - 39 39
40
www.fadsdirectory.com 3
22 23
24 - 25 26 - 29
Contact
General Enquiries
content@managingwater.co.uk Tel: 01480 393743
Advertising
advertising@managingwater.co.uk Tel: 01480 393743
Editorial
articles@managingwater.co.uk Tel: 01480 393743
Subscriptions
subscribe@managingwater.co.uk Tel: 01480 393743
Published by: Relbon Ltd
Company Reg 07488993 Relbon House 3,Peate Close Godmanchester Huntingdon
Cambs, PE29 2DX, UK
admin@relbon.co.uk
20 - 21
12 13 13
14 - 18 19
10
Stormwater drainage at Happy Valley
4 - 6 4 4 4
5
6 - 9 6 7 9
10 - 11 10
Bio-engineering and erosion control
26
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40