The on-line magazine for the water management industry and its environment
Sept 2012
Image: River Ebbw, with Tensar VMax P550 erosion control installed. See page 26
In this issue
• Channel Restoration • Erosion control
• Bank Stabilisation & Repair • Stormwater control at Happy Valley • The Welsh Beaver Project • Calverton Fish Farm - a look inside
in association with 
www.fadsdirectory.com
    Page 1  |  
Page 2  |  
Page 3  |  
Page 4  |  
Page 5  |  
Page 6  |  
Page 7  |  
Page 8  |  
Page 9  |  
Page 10  |  
Page 11  |  
Page 12  |  
Page 13  |  
Page 14  |  
Page 15  |  
Page 16  |  
Page 17  |  
Page 18  |  
Page 19  |  
Page 20  |  
Page 21  |  
Page 22  |  
Page 23  |  
Page 24  |  
Page 25  |  
Page 26  |  
Page 27  |  
Page 28  |  
Page 29  |  
Page 30  |  
Page 31  |  
Page 32  |  
Page 33  |  
Page 34  |  
Page 35  |  
Page 36  |  
Page 37  |  
Page 38  |  
Page 39  |  
Page 40