PRODUCTS & SERVICES Telephone: 020 7880 6206 Email:
darren.hale@redactive.co.uk
Royal approval for low energy sustainable building of the future A Remeha 100kW biomass boiler is bringing energy efficient, low carbon heating to the newly opened Visitors’ Centre at the Duchy of Cornwall Nursery at Lostwithiel, Cornwall. The new building is a testament to the Prince of Wales’s vision of sustainability in the built environment. Remeha Commercial’s biomass
boiler is the latest initiative contributing to the reduction of the carbon footprint of the Duchy Nursery by 70%. This modulating, fully controllable biomass boiler is fuelled by locally sourced, low to zero carbon wood pellets, making it environmentally sound and economically viable. l For more information call 0118 978 3434 or visit
www.remeha.co.uk
Windowmaster wades into community college natural ventilation scheme WindowMaster is supplying and installing an automated window control system for the £26 million refurbishment and new build of Neale Wade Community College in March, Cambridgeshire. Currently under construction, the college forms part of the Cambridgeshire Building Schools for the Future programme. WindowMaster supplied its full NV Advance system to control 550 MotorLink actuators in the composite windows supplied by sister company VELFAC, as well as the MotorLink actuators on the aluminium windows in the curtain walling. l For more information visit
www.windowmaster.co.uk
PSL DataTrack helps business growth without overhead increase Since the purchase of PSL DataTrack’s business administration and production software in 2007, Andromeda Telematics Limited (ATL) has realised many benefits. The company integrates intelligent building systems and has grown very quickly following involvement in high-profile projects such as Heathrow T5 and the O2 arena in Dublin. Carl Sexton, ATL’s financial controller, said: ‘Since the installation of DataTrack, our business turnover has doubled, but our office administration numbers have remained the same.’ l For more information call 0845 634 5931 or visit
www.psldatatrack.com
www.cibsejournal.com
Significant benefits for multi-million pound PFI scheme Apex Wiring Solutions has won the contract to supply a modular wiring system for the redevelopment of St Bartholomew’s Hospital in London. The move is part of the second phase of London NHS Trust’s PFI funded redevelopment of hospital and healthcare facilities across the capital. Modular wiring has been specified to cut electrical installation times, reduce onsite waste and provide a pre-wired factory tested power and lighting system. l For more information visit
www.apexwiringsolutions.co.uk
Stokvis heating systems at The Energy Event Stokvis Energy Systems featured an evacuated tube solar collector at The Energy Event exhibition in September. When coupled to a solar store and then linked to plate a heat exchanger the collector saves money by utilising free solar energy, reducing the input required from the boiler plant. Independent laboratory tests prove that the system produces more than 750kWh/m2 in direct heating mode and a 850kWh/m2
per year per year
in pre-heat mode. l For more information call 0208 783 3050 or visit
www.stokvisboilers.com
Dunphy joins forces with DRU for large, modern church heating project Church heating specialists Christopher Dunphy Ecclesiastical and heating manufacturers DRU have combined to supply a complete new heating solution to a large, modern Roman Catholic Church in Chester. St Columba’s was built in the early 1960s and is an impressive example of church architecture from that period. The light and airy interior can accommodate up to 600 people. Most of the structure consists of laminated timber portal frames with a vaulted timber ceiling. l For more information call 0161 793 8700 or visit
www.drufire.co.uk
October 2011 CIBSE Journal 73
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80