Modern Hydronics Prefabrication: A key to higher quality and profit
By John Abularrage, Advanced Radiant Design, Inc., Stone Ridge, N.Y. P
refabrication is by no means a new concept. It has existed in the industry for more than 50 years and, although it is underutilized, it offers a number of
important benefits. Prefabrication also presents some challenges, however, and it requires close attention to detail and a highly organized approach.
Advantages abound It is generally accepted that prefabrication can save
50% or more in labor costs over site fabrication. It pro- vides the ability to meet demanding schedule deadlines by allowing fabrication in advance of field availability. At times, we have had as many as a half dozen control pan- els prefabricated in our shop, waiting for the appropriate time for installation. This solves the problem created by the “wait and hurry up” jobs that would otherwise be impossible to complete in a timely manner. Prefabrication provides a controlled and comfortable
work environment with all the necessary tools at your dis- posal. It prevents the repetitive setup and breakdown on a daily basis usually required with field fabrication. On long distance jobs, prefabrication can reduce travel time and expense. It also permits unrestricted work hours, not subject to the time constrictions that may exist on a given jobsite.
The prefabrication process is best
accomplished with continuity of responsibility. If the same person is performing the site survey, fabrication and installation, any conflicts can be readily identified and
remediated. Coordination and communications with related trades is also streamlined.
Ultimately, the quality of prefabricated work is much higher than the quality that can usually be achieved in the field. A less evident benefit of prefabrication is training. Mentoring an apprentice under shop conditions with real- world applications is priceless. It acts as a bridge between the classroom and the field. I’ve found the ability to train from theory through development to fabrication and, finally, to the installation of a control panel, to be a most effective training methodology.
Planning is key The prefabrication process is best accomplished with continuity of responsibility. If the same person is per-
Page 26/Plumbing Engineer
A prefabrication panel — This visually important refine- ment communicates a high level of craftsmanship and professionalism.
forming the site survey, fabrication and installation, any conflicts can be readily identified and remediated. Coordination and communications with related trades is also streamlined. The process of prefabrication always begins with accu-
rate measurement of the space available for the prefabri- cated equipment. You need to avoid what is referred to in the data processing industry as “garbage in, garbage out.” The last thing you want to happen is to deliver a prefab- ricated control panel that is larger than the available space to a jobsite. Once the site survey is complete, it’s time to generate an
accurate CAD drawing of the floor and wall space avail- able for all of the system components, including control panels, boilers, tanks and supply and return piping that will connect to the control panel. This drawing must include any equipment from other trades that needs to be in the mechanical room. Access for servicing of the equipment is critical and needs to be documented in the drawing as well. Starting from an accurate piping schematic, the basic
layout of the fittings and components can begin. There are always many variations of the layout that can affect the overall dimension of the panel. Sequencing either verti- cally or horizontally can make a tremendous difference in dimensions in either direction. It always seems to amaze me that, regardless of how much space is available, it so often comes down to a matter of inches in order to make a control panel fit in the allotted space. When laying out the components, consideration must
be given to the hangers that will support the system. This sometimes requires adding additional length to piping between components to accommodate the hangers. Once the layout is decided, all dimensions must be confirmed with the mechanical room drawing. Then the actual
Continued on page 28 May 2011
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72