This page contains a Flash digital edition of a book.
48
Quality is the Norm
Norm Fasteners Group
Izmir
The Norm Fastener Group has demonstrated remarkable growth and technology development since its
establishment in 1973. A leading exporter and domestic supplier of automotive grade fasteners and
special parts from its Norm Civata manufacturing operation – the largest bolt factory in Turkey - it is
also, through its Norm Standard business, one of the country’s biggest traders in an extensive range of
standard products.
Later this year Norm will feature as our Cover Story – when we will identified by bar code – each job card carrying bar codes for each stage
fully explore its history as well as the operations of its four facilities in of production, starting with the code applied to each wire coil as it is
Izmir. Here, we focus on two significant recent developments in Norm’s received. “We carry out all the processes of fastener manufacturing in
continual commitment to enhancing efficiency and quality levels. house,” says Fatih Uysal, “so we maintain complete traceability under
Leading a tour of the Norm operation deputy chairman M. Fatih our own control from beginning to end.”
Uysal quickly points out that the group has adopted lean manufacturing Supervising overall material and product quality control is a large
principles – a process started around six months ago and clearly well- laboratory at the bolt factory – with two satellite laboratories, one at the
established already. Above the rows of cold formers hangs a banner, nut factory, one at the coatings plant, carrying out specific analysis.
signed by every operator, proclaiming Norm’s objectives in ensuring the The good housekeeping evident throughout the Norm operation is
highest standards in quality and productivity. Each of the three buildings also fundamental to the new approach. “We are very sensitive about
in the bolt factory operates as a lean cell, with teams meeting every housekeeping,” says Fatih Uysal. “We recognise very clearly that taking
morning to decide objectives for the day. Display boards provide images pride in the working environment is an important part of taking pride in
of correct operational and safety conditions – these are also to be found the quality of our finished products.”
In-process monitoring at SPC centre
on some machines. Another board provides detailed performance Quality of finished product, or more precisely of its finish, has also
feedback; a third is dedicated to social activities, the highlight of which been the driving force in a recent major investment at Uysal Makina,
is the annual family day. “We invite the families into the factory where Norm’s coating and packaging operation, where the company began
we stage a picnic,” explains Fatih Uysal. “It is very important to bond operating a new Zinc Nickel coating line in February. Norm already
the family to the business.” had MacDermid licenced ZinKlad® 250 Zinc lines as well as a Doerken
Equally visual but focused directly on the key lean tenet of producing MKS licenced Cr-free Delta Protekt Al/Zn operation. The new PLC/
good parts first time every time, each production machine carries a PC controlled line, Turkey’s most advanced barrel-type alkaline Zn/Ni
colour coded record card – a green dot records each customer defect- system, applies Zinklad 1000/1000B. The final coating includes 12-15%
free day for that machine; with a monthly summary on a second card. Nickel delivered as part of a minimum 8 micron coating to ensure the
“A red dot would indicate a customer reported defect related to that best possible corrosion resistance performance. Norm has three salt spray
machine,” says Fatih Uysal. “Central to our lean approach is that each cabinets for carrying out corrosion tests to US and European standards.
operator takes full responsibility for the quality and performance of his The coatings laboratory also houses a recently acquired Schatz torque
machines.” friction tester. “Our previous machine did not have the rotational speed to
In-process quality is monitored personally by each operator who fully simulate assembly,” explains Fatih Uysal. “Particularly important as
carries out regular dimensional checks at computerised SPC centres the friction heats the coating affecting the torque characteristics. The new
located frequently amongst the machines. Each centre comprises a machine operates at 200rpm ensuring full simulation – it is one of only
screen and keyboard, with the relevant gauges linked direct to the two or three similar machines in operation throughout Europe.”
computer system. Out of tolerance readings automatically trigger an It is also just one example of attention to detail characteristic
alert to the screens of both quality and production managers. The job is throughout the Norm operation – of which more later in the year.
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140