Products & Services
Telephone: 020 7324 2787 Email:
ali.scott@redactive.co.uk
2009 training courses Phase Change Material
shelter cooling. Application examples of its negative
from Grundfos Products (PCM) Ltd
temperature PCM’s include food stall cooling,
PCM has unparalleled experience of designing and marine refrigeration, and cold store
advising on PCM installations and applications, back-up.
and is constantly developing new ways to l Visit
www.pcmproducts.net for full
use PCMs. To complement PCM’s technical technical details and the Thermal Energy
expertise, it has developed what it believes is the Storage Design Guide.
most comprehensive range of PCMs currently
commercially available. PCM offers a number of
different encapsulation and processing techniques;
depending on the end use of the application,
uses of its positive temperature PCMs include
As part of its commitment to continue to support air conditioning, building passive cooling, water
the industry, Grundfos Pumps has completed a full heating, solar heating, boiler waste heat storage,
review of the training courses it offers and is now heat rejection systems, and telecommunication
pleased to advise on its new training schedule for
2009.
The diverse range of course topics covers a range
Aircraft Air Handling
of applications including heating, water boosting, Classroom Ventilation Units
ground water and sewage, as well as courses that 260mm high. Silenced to
look at variable speed technology and solutions. nr25 Plate recuperater 60%
All are available on a range of dates throughout efficient. Air Volume 0-500 litre/s.
2009 and at a choice of three different geographical Heating LPHW/ELECTRIC.
locations. Grundfos has designed the training Cooling CW/DX. Larger air volumes
schedule to ensure that there is something for and bespoke units available.
everyone who has an interest in developing their l Visit
skills in particular areas of new pump technology.
www.aircraftairhandling.com
As you would expect from a key player in the
pump industry, courses are free and are delivered by
staff who are experts in their sphere.
l Visit
www.grundfos.co.uk or email
uk-training@grundfos.com
SmartCool: ‘Next generation’
DX system. At a nominal £0.11/kWHour this
Grundfos Pumps’ supreme solution
precision cooling
equates to an approximate saving of £8,000/year or The judicial system
Airedale’s SmartCool is a flexible, 31,000kg of CO2. in the UK has long
future-proof, high density Airedale is the first precision cooling been seen as the
precision cooling solution offering manufacturer to offer inverter-driven founding father to
more cooling for less energy in compressors with such a wide range the wider justice
critical IT environments. Within of speed control, from 25 to 100%. The system around the
SmartCool’s sleek, compact direct drive EC fan option in SmartCool world. The latest
exterior lies a synergy of advanced is 70% more efficient than its AC fan provision of a new
technology and cutting-edge equivalent at part load. Supreme Court is
components. SmartCool offers13% more cooling another important step on this continuous journey
For versatility and built-in 2N kW/m_ and a 30% increase in system to ensure that justice and impartiality are upheld.
redundancy, optional dual cool offers efficiency compared with Airedale’s previous This new Supreme Court will be a fitting location
DX (R410A) and chilled water cooling mediums generation precision cooling products. for the countries most senior judges who will soon
within the same case. A glycol free-cooling variant l Tel: 0113 2391000 Email: marketing@ be installed in the newly refurbished Grade 2-listed
uses 46% less power than the equivalent air-cooled
airedale.com Middlesex Guildhall, on Parliament Hill.
The building is currently undergoing the
BDP specifies HCP trench heating
final stages of a £37m renovation that has
for its Manchester office
sympathetically integrated the historical fabric
of the building with the current more modern
HCP, a division of SAS International, supplied demands.
600 metres of trench heating to BDP’s recently The final solution will have benefited from the
completed Manchester office. The 33,000 square expertise of a wide range of companies including
foot six-storey office, located on Ducie Street in Halsion Ltd the specialist M&E contractors who
Piccadilly Basin, includes a large open-plan studio worked with partners Grundfos Pumps to deliver
space as well as an interactive area on the ground a complete pump solution that will meet the
floor which includes a cafe, staff restaurant and an wall cladding cleats and the pipes used for rain water expectations of such an exalted audience. The
extensive reception area. harvesting. In total three different ‘top hat’ brackets Grundfos solution comprises of a range of TPED
The trench heating is located around the were used and two of which also integrated cable energy efficient centrifugal pumps, a Hydro Multi E
perimeter of the new six-storey building. This project trays. booster set and a range of IMpress pressurisation
required the trench heating to sit upon a special ‘top l Visit
www.hcp-sasint.co.uk/ sets.
hat’ shaped bracket, in order to bridge the curtain trench-heating.htm l Tel: 01525 850000
58 CIBSE Journal March 2009
www.cibsejournal.com
CIBSEmar09 pp58 products.indd 58 5/3/09 11:39:26
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76