This page contains a Flash digital edition of a book.
GEZE conquers highs and lows of student life


GEZE products are giving students access to the highs and lows of student life in a development which incorporates a 21-storey tower block and three low-rise residences.


Chamberlain Hall – part of University


of Birmingham’s Vale Village scheme – saw the replacement of the 50-year-old Eden Town, known as High Hall and its associated wings with new purpose- built accommodation.


It provides a home-from-home for


725 students in either en-suite study bedrooms in clusters of five or six, which share a kitchen/lounge - or self- contained studios.


GEZE products were used throughout


the development. Every bedroom and circulation door, more than 800 in total, is fitted with a TS 3000 EC. This surface-mounted door closer has a low opening force, requiring less energy to open it, making it a great choice for an educational building.


It adheres to strictest safety


standards, and not only features an adjustable hydraulic latching action, closing force and closing speed, but also incorporates a sleek guide rail


rather than an obtrusive arm to make it safer choice for residents.


University of Birmingham project


manager, Daniel Holmes, said: “The GEZE products fit the bill and we are pleased with how they have performed.”


For more information about GEZE


UK’s comprehensive range of automatic operators, manual door closers and window technology products, visit:


www.geze.co.uk


a d v e r t i s e r s i n d e x Company: Page no: Able Canopies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33 Collinson . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 Harlequin Floors . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 Salto Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Itec Floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .IFC sef . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 Junckers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 Kemper Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 Prefect Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 Vestre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Company: Page no: Renolit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25 Rubb Buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29


Xtralite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37