BUILDINGS, MAINTENANCE & REFURBISHMENT


Bostik and Sedgley stick to the timetable B


ostik has supplied technical advice and subfloor preparation products to facilitate the installation of the flooring at a new school in Oldham,


helping to overcome some difficult conditions and ensure the project was completed on schedule. The purpose-built, four-storey Oasis Academy Leesbrook building is now


catering for 1,500 pupils aged 11-16, having opened its doors after a two- year construction period. Sedgley Flooring Solutions was contracted to install the flooring in the


building – approximately 6,500m2 of vinyl sheeting and 3,500m2 of carpet tiles – and the contractor turned to Bostik for its wide range of products and technical expertise. When Bostik’s technical team initially visited the site to carry out


preliminary tests, it was quickly apparent that certain areas of the subfloor posed a challenge. For example, there was water damage on the upper levels and some parts of the concrete showed signs of rebar shadowing. Based on this, the Bostik team compiled a report for Sedgley Flooring


Solutions that laid out the issues present and advised on how to overcome them to ensure that the floor coverings could be installed to the highest possible standard. Based on Bostik’s recommendations, Sedgley Flooring Solutions


mechanically abraded the subfloors to address the issues with the concrete finish, and then set about applying the preparation products, taking different approaches to the dry ground floor and the wet upper floors. On the upper floors, before the application of a damp-proof membrane


(DPM), the company pre-smoothed the rough-textured and pitted areas using Bostik’s multi-purpose Universal Primer, followed by Screedmaster Ultimate, Bostik’s two-part smoothing compound which offers fantastic workability and flow characteristics. This was necessary in order to create a flat surface, as trying to DPM rough or pitted floors results in excessive product use due to the product filling in all the voids and hollows, and often leaves concern as to whether there is an even controlled thickness where the subfloor overly consumes the DPM. Insufficient film thickness on a DPM can result in significant flooring failures.


They then left these areas to dry for 24 hours before applying


Screedmaster One Coat Membrane, Bostik’s epoxy surface damp-proof membrane (DPM), to control the excess moisture present throughout the upper floors. Once the upper floors had cured overnight, both those and the ground


floor were ready to be primed and smoothed ahead of receiving the floor coverings. This was again done using Universal Primer followed by Screedmaster Ultimate. In the areas that required building up by 20mm, Bostik Screedmaster Epoxy Primer was used before application of the smoothing compound. Aided by Bostik’s technical advice and subfloor preparation products,


Sedgley Flooring Solutions was able to install the floor coverings on schedule, ready for when teaching was due to begin in the new building.


SOME THINGS REMAIN... OTHERS DON’T


Heckmondwike’s Supacord range was launched in 1973, the same year Britain joined the European Union. However, our UK manufactured Supacord has stood the test of time.


01924 406 161 | sales@heckmondwike-fb.co.uk www.heckmondwike-fb.co.uk


May 2021 www.education-today.co.uk 35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48