ADVERTORIAL
oven replacement program into a broader energy transformation. Bühler Scherler’s energy consulting team supports the development of the overall energy concept for the site, while the next OptiBake wafer lines are planned in parallel.
Step 3: Growth with a clear conscience By now, three of the customer’s four original gas ovens have been replaced with OptiBake technology. But the fourth oven presents a
different situation. It is still relatively young, at less
than 20 years of age, and replacing a technically viable asset simply for the sake of completing the transition would not necessarily make economic sense. So instead of replacing it prematurely, the customer takes a different approach: expand
AT THIS POINT, IT BECOMES
ESSENTIAL TO LOOK BEYOND THE WAFER OVENS AND CONSIDER THE ENERGY REQUIREMENTS OF THE ENTIRE SITE: BUILDING HEATING, PROCESS HEAT, STEAM DEMAND
the installation of the new OptiBake oven. In parallel, Bühler’s Energy Optimization Service (EOS) is used to maximize the efficiency of the remaining gas-fired oven. The customer can therefore grow
production while continuing the transition toward a more efficient and electrified factory.
The bottom line At the end of this journey stands a very different production site. The customer has dramatically reduced the energy required for wafer baking. Dependence on natural gas, gas-price volatility, and CO₂-related costs has been reduced. At the same time, the company has strengthened its sustainability position and created an energy infrastructure that is better prepared for future expansion. And perhaps most importantly, the transformation
did not
with induction and optimize what remains. A fifth wafer line equipped with
OptiBake is added, increasing production capacity while avoiding an additional dependency on gas. At the same time, the remaining gas-
fired oven is retained and optimized rather than prematurely replaced. A joint workshop with Bühler addresses new product opportunities, line planning, and
20 • KENNEDY’S BAKERY PRODUCTION • OCTOBER/NOVEMBER 2026 require an
overnight leap from one energy system to another. From the first discussion about energy
strategy and grid requirements to the installation of capacity, Bühler
additional production can accompany the
customer throughout the transformation. Because the transition from gas to induction is ultimately about more than replacing an energy source. It is about creating a more efficient, flexible, and future-ready wafer factory.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48