search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ADVERTORIAL


LANDSCAPE T


CHANGING ENERGY


From gas-fired to induction-baked: How one mid-sized wafer producer can transform its energy footprint.


oday’s industrial world is shaped by volatility and uncertainty. Energy availability, fluctuating prices, regulatory


pressure, and ambitious sustainability targets are creating new challenges for manufacturers across the globe. The baking industry is particularly exposed


to these developments. Gas remains the primary energy source for many industrial baking processes, leaving producers vulnerable to fluctuations in both availability and cost. And although natural gas is often considered one of the cleaner fossil fuels, it still generates greenhouse gas emissions and contributes to the environmental footprint of industrial production. For the wafer industry, electrification


itself is not new. Electrical resistance heating has long provided an alternative to gas-fired baking and can eliminate direct emissions from the baking process. However, conventional resistance heating also comes with disadvantages in terms of energy efficiency, maintenance requirements, and precise control of the baking process, all of which can affect the consistency and quality of the final wafer sheet. With the new OptiBake inductive


wafer baking oven, there is now another path. Induction technology enables manufacturers not only to move from gas to electricity, but also to overcome many of the limitations associated with conventional electric heating. At the same time, it brings a new level of flexibility to


both baking and production. But replacing the oven is only one part


of the equation. When moving from gas-fired to inductive


baking, one important consideration is the plant’s electrical infrastructure. How much additional power is required? Can the existing grid connection handle it? And when does electrification become a broader strategic energy project for the entire factory? The following example illustrates how such a transformation can be approached step by step.


A journey in three steps, with Bühler as a partner throughout Consider a typical European wafer producer operating four wafer production lines. The plant runs an average of two shifts per day, five days a week, 45 weeks per year. The


company, a classic mid-sized


manufacturer, produces a variety of plain wafer products with multiple cream layers. After baking, the wafer sheets pass through spreading machines, coolers, cutters, and packaging lines. Each existing gas-fired oven consumes


BY SWITCHING TO OPTIBAKE, THE CUSTOMER HAS THE


POTENTIAL TO REDUCE THE OVERALL ENERGY DEMAND


FOR WAFER BAKING BY UP TO 50%, FROM ROUGHLY 9 GWH TO AROUND 4.5 GWH PER YEAR


approximately 3.5 to 4 kWh of gas per kilogram of baked wafer sheets, depending primarily on the recipe, water content, and final wafer sheet weight. The annual baking energy demand across all four lines reaches approximately 9 GWh, supplied entirely by natural gas. Most of the remaining equipment at


the site already runs on electricity, baking therefore remains the plant’s largest direct dependency on fossil fuel.


The vision: Cutting baking energy demand in half The customer could, of course, simply continue operating the gas-fired ovens. But looking ahead, the business case for change becomes increasingly compelling. Rising CO₂ costs, growing sustainability requirements, uncertainties where the gas price might lie in the future, and the need to prepare the site for future expansion all point in the same direction: electrification.


18 • KENNEDY’S BAKERY PRODUCTION • OCTOBER/NOVEMBER 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48