search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
TEMPORARY BUILDINGS


L


eading manufacturer of modular buildings, Thurston Group, is setting  and sustainability, with a £250,000 investment to achieve early compliance with upcoming changes to construction site  manufacturer to achieve EPC A rating while  Tough new requirements are being rolled out in January 2025 by the Fire Protection Association’s Joint Code of Practice (JCoP) to   


 manufactures 4,200 temporary accommodation  product development and testing to ensure its units comply with the guidance and requirements,  Thurston’s Temporary Accommodation Units have been tested and surpassed JCoP  JCoP requirements while attaining an EPC A rating highlights Thurston’s dedication to  temporary accommodation solutions for the 


  for temporary accommodation units being installed within six metres of a building, a    emphasis on units maintaining their load bearing capacity (R,) along with structural integrity (E,) and their thermal insulation (I)1  Matt Goff, managing director at Thurston Group, emphasises the company’s commitment


THURSTON GROUP BLAZES TRAIL IN FIRE SAFETY WITH £250,000 INVESTMENT TO ENSURE EARLY COMPLIANCE WITH NEW REGULATIONS


to safety: “As the largest supplier of temporary accommodation and modular buildings used extensively by the construction industry, Thurston Group has been leading proactively   recent months has found that ensures our temporary accommodation units not only meet but surpass the requirements of the  


“We are proud to see the modular industry  Thurston Group is delighted to be at the 


Thurston Group’s commitment extends  house design teams are actively developing  


The JCoP is written by the Fire Protection Association and is considered the benchmark   


The legislation changes in the JCoP 10th edition outline the requirements for any new 


46 NOVEMBER 2024 | FACTORY&HANDLINGSOLUTIONS


A minimum 6m (but preferably 10m)  other buildings


A limit on temporary building height (of 18m)


Locating units in areas which are easily accessible to the emergency service


 all temporary buildings


Design improvements for temporary 


  combustible insulation, materials producing minimal smoke, and those that do not create 


Enhanced roof safety: replacing currently  


Thurston Group thurstongroup.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58