machInery & machIne safety


length of approx. 6.5 kilometres conveys coal from a new underground mine portal to its main coal prepration plant. In the original request for quotation, the client requested four straight conveyors where three transfer towers would have been needed. for Beumer group, there was clear potential for optimisation here, of which the system provider was able to convince the customer. the Beumer team was also faced with


exciting challenges in a Belgian project. since the 1970s, the residues of a coal-fired power plant were landfilled on a fly ash stockpile. It was intended to transform the terrain into a nature park. In order to make this possible, the fly ash had to be conveyed to the mass river, about two kilometres away, where it is loaded onto ships for further transport. these bring the fly ash downstream to an adjacent cement plant, where it is recycled as an aggregate. a pipe conveyor is used, whose enclosed


design prevents the volatile material with the environment and enables a low-noise transport. this was of particular significance in this project as the conveyor runs over roads, rails and residential areas. In the residential areas, a particularly noise-reduced idler design developed by Beumer is used, which meets the high noise protection requirements in this area. the prescribed limit of 35 decibels at a distance of ten metres from the conveyor roughly corresponds to a very quiet room fan at low speed. here, the system also achieves a slope of 23 degrees, which can be easily implemented with a pipe conveyor. Because of the rough terrain, special cranes and even helicopters were used during the installation.


ThE individUally fiTTinG sysTEM how does the system provider manage to provide the appropriate solution for each of these applications? "We can draw on our comprehensive experience," says martin rewer, team lead overland conveyor at Beumer group. Beumer group installed the first conveyor of this type with horizontal curves already in 1969; the first downhill conveyor with regenerative drive in 1980. since the 1990s, Beumer group has also developed into one of the leading suppliers of pipe conveyors. In 2019, two systems were commissioned in china that, with 5,500 tonnes of iron ore per hour, defined the current performance peak of the globally installed


systems of this technology. since the first overland conveyor with


horizontal curves was constructed in 1969, components such as idlers, belts and drives have continued to develop. In addition, the systems are becoming larger and longer and the routes more complex. this resulted in the necessity to also constantly improve the calculation and the planning tools in order to not only withstand the requirements, but to even be one step ahead. In the first step of project planning, the


systems must be dimensioned for the respective task. using Beumer calculation programs, a team of experts calculates the existing motion resistances and the related static and dynamic tractive forces of the belt of the system. these on the other hand determine both the drive power to be installed and the belt strength, and are also considered in the dimensioning of the horizontal curves. "the energy consumption of long, horizontal


belt conveyors is determined by the main resistance in the upper and return strand in stationary operating conditions," describes rewer. the energy consumption consists of the running resistance of the idlers, the indentation rolling resistance and the flexing resistance of both the conveyed material and the belt when running over the idlers. the forces required for overcoming these resistances depend on various operational and design parameters. they can be determined with the so-called single resistance method. If components with low running resistances are considered, such as belts with reduced indentation rolling resistance or running- optimised idlers, the calculations of the systems nowadays show considerably lower tractive forces of the belt than a few years ago. this not only results in lower energy costs. since the tractive forces of the belt are at a lower level, also the radii of the horizontal curves can be selected to be correspondingly smaller, because these forces are decisive for the design of these curves. accordingly, the routing of overland conveyors can now be realised in a more flexible way and with smaller radii.


fRoM ThE viRTUal ToolBox "In order to plan the conveyor for the individual application, we reach into our virtual tool box," rewer explains. "this way we can arrange the whole routing of the system and then discuss it with the customer as a 3d plan". Bolt, the Beumer overland layouting tool developed specifically for this purpose, generates almost automatically a digital 3d model of the conveyor in the virtual landscape during the project planning. the required topography data are available in the public domain or are provided by the customer. often drones are used. the aerial photographs include topographical information, which is then processed into digital terrain models. In the simulation environment, the experts


can adapt the conveyor to the route. the almost real illustration of the conveyor in the landscape also serves to recognise possible obstacles and to consider them accordingly in the project planning. furthermore, the technicians are able to add the earthworks (cut & fill) and the steelwork structures in simple and precise way and evaluate them. Bolt not only ensures a very fast first project planning of the route. especially modifications or adaptations during the project can be taken into account within short time. project-critical data can be supplied at short term by Bolt. It includes the definition of the entire equipments on the route as well as the coordinates for foundation and earthworks. since these data are generated automatically and updated by Bolt in case of modifications, possible required adaptations of the route are not further time-critical. all necessary data can be generated immediately after rescheduling. "With this procedure we are able to


considerably accelerate the project planning," promises dorra. "We have the possibility to provide the customer in advance with a concrete 3d project planning, which can be easily modified during the project life. this procedure allows us to tighten the time frame for the project".


BEUMER Group www.beumer.com


factory&handlIngsolutIons | novemBer 2021 43


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58