search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
www.heatingandventilating.net


Energy from waste accelerates decarbonisation in London


Veolia, the decarbonising energy specialist, is planning a new district heating network in London that will deliver heat from the Group’s SELCHP Energy Recovery Facility (ERF), working in partnership with Southwark Council


B


y using 75GWh per year of low carbon heat from the electricity generating process that treats non-recyclable waste, the network


aims to supply 4,700 homes across 11 social housing estates and schools. Currently almost half of the final energy


consumed in the UK is used as heat and the do- mestic, commercial and public sectors account for two-thirds of this energy consumption. This is largely fossil fuelled and district heating networks, using the heat from the waste-fed electricity generation process, represent an efficient, affordable and decarbonising alternative to provide households with cleaner energy. Veolia will design, construct, commission and operate the network. Once operational, the infrastructure project aims to provide the heat with around a 60% renewable content due to the biogenic component of the treated waste. The ambition is to save an estimated 14,000 tonnes of CO2 emissions


Heat networks


that distribute heat in the connected buildings to meet the thermal demands at each location. As this system rep-resents a low carbon solution compared to alternative supplies, emitting on-ly 0.026kgCO2/kWh, it would also help to advance Southwark Council’s ongoing commitment to tackling the climate emergency and reducing the boroughs carbon footprint. In a significant move earlier this year, Southwark Council approved a Local Development Order (LDO) permitting the construction of the new network. They are the first authority in London to introduce a LDO.


This new network builds on the success of the


existing urban heating network powered by SELCHP, which already provides low-carbon heat to 2,700 households and has saved around 95,000 tonnes of CO2 over the past ten years. The extension aims to support the future growth to accommodate 20,000 new homes over the next 15 years in line with Southwark Council’s Area Action Plan. Estelle Brachlianoff, chief executive of Veolia said:


a year compared to the current natural gas or oil boiler derived heat supplies. Heat, supplied as hot water, would be supplied


through a 7km network of insulated pipework at temperatures up to 95°C, and fed into the systems


FOR BOILER CONDENSATE AND PRV


PH-3.8L-HW 3.8-LITRE PRV AND CONDENSATE PUMP


PART CODE PH-3.8L-HW


“Developing local decarbonisation helps to break the dependence on fossil fuels and provide reliable heat to support communities and address energy price volatility. Our new district heating network in London will enable the UK to make further progress towards its decarbonisation targets by 2035.” “Veolia benefits from a unique and differentiating positioning thanks to the combina-tion of its expertise in waste and energy, which makes us the reference in local decar-bonised energy.”


PH-5L-HW FOR UNVENTED T&P


HIGH TEMPERATURE AND PRESSURE RELIEF PUMP


• Deals with boiler condensate • High pressure and pressure relief pump


8


MAX. FLOW 312 L/H TANK CAP. 3.8L


DECIBEL RATING 53 dB(A) 1.5L PUMP CYCLE 2.8pH


BOILER UP TO


6 4 2 0 150 300 450 600 CAPACITY (LPH)


MAX. FLOW 1200 L/H 20 LPM


PART CODE PH-5L-HW


3.8L LITRE TANK


This 3.8L pump has been designed to handle standard condensate and to instantly reduce the temperature of any PRV discharge. The pump is manufactured from high temperature plastic and higher specification hose. The pump has an extra large drink cycle of 1.5 litres Suitable for boiler condensate and PRV discharge for boilers upto 42kw and boiler condensate only for boilers up to 600kW.


DOWNLOAD THE HVR APP NOW 25mm INLET


PER MINUTE UP TO


32L LITRE TANK 5L


Manufactured in the UK this heavy-duty, high-temperature tank pump incorporates thermal overload protection and high-level alarm switch. Ideal for unvented cylinder T&P discharge and steam humidifiers. Having one of the largest discharge rates of 20 litres per minute, this pump can handle both high-temperature up to 100 degrees and high-flow rates.


TANK CAP. 5L


• Unvented temperature and pressure relief


• Solar cylinder temperature and pressure relief


6 8


4 2 0 500 1000 CAPACITY (LPH)


pump-house-ltd pumphousepumps


December 2024 19


@pumphouseltd @PumpHouseLtd diversitechuk


1500


sales@diversitech.com www.diversitech.global


METRES HEAD


HEATING & PLUMBING SOLUTIONS


METRES HEAD


HANDLES UP TO 110°C


HANDLES UP TO 100°C


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32