PROCESS AUTOMATION
CREATING FACTORIES OF THE FUTURE...
... using factories of the past. John Flynn, UK&I Smart Factory business development manager, Schneider Electric, says future-proofing factories starts with a good understanding of the here and now
he factory of the future is not an amorphous idea. It is a fully formed reality, answering the real challenges of today while securing a sustainable future. Manufacturers stuck in the cultures and technologies of yesterday will quickly find themselves left behind. The future is now. There are plenty of reasons why factories need to accelerate evolution. Green manufacturing is no longer a nice-to-have; achieving net zero is a global priority. Cost and efficiency savings are also a must at a time of continued supply chain disruption. Anything that causes unnecessary expenditure or delay can impact long-term resilience, growth, and competitiveness irrevocably. And, with the constant threat of cyberattacks, factories must be able to match innovation with digital protection. With such a range of challenges to master, it might feel like the only answer is to start from scratch. Not so. It is both practical and sustainable to take existing brownfield infrastructure and retrofit to future-proof. The question is, how can existing factories be updated to meet these expectations? The Flint smart factory in Wales brings to life a three-stage approach manufacturers can use to realise this challenge. Schneider Electric's Flint factory is more than 30 years old and manufactures PVC trunkings for domestic and international markets. Much of the machinery was outdated and analogue. The site was the highest energy consumer of all Schneider Electrics factories in the UK, and it was also a significant user of water. Therefore, the site was seen as an opportunity to create a smart factory. This involved retrofitting the factory rather than removing and replacing machinery, allowing us to maximise efficiency and minimise downtime. As the UK's first Schneider Electric smart factory, Flint provides a model for revolutionising aging infrastructure to deliver operational effectiveness and sustainability. It started with painting a complete picture,
T
using an auditing tool that prioritised modernisation strategies. This included: 1 - Low voltage auditing The first step in any such project is ensuring that you have a complete view of your installed base. This isn't just a matter of listing what you have, VSDs, PLCs, HMIs, UPS's, etc, it is about critically auditing how important they are to your operation, or are they obsolete? The first step is low voltage inventory mapping, contextualising plant assets in a unified view of all automation inventory. From here, it is essential to assess the lifecycle status of those assets; do you have a maintenance plan? Have you got spare parts? What risk do they present to the business? Flint suffered from aged, obsolete equipment from multiple vendors. Full audit information was digitised enabling visibility over the installed base. This enabled several next steps; modernisation of the existing LV installed base as required, digitalisation of the start of shift system, the addition of smart metering, smart lighting, remote monitoring, and an AR augmented manual to make repair easier while allowing staff to know they have spare parts in stock.
2 - Single line to electrical distribution The second facet of preparing for the future factory is understanding the Electrical Distribution System. At Flint, a confusing paper system had resulted in an outdated, unreliable, and uncontrollable network.
Work was undertaken to digitise the Single Line Diagram (SLD) with an intelligent digital model with full visibility. This enabled the creation of a digital twin, to assist with fault finding during maintenance activities, Root Cause Analysis and enable change modelling. 3 - Security in the digital factory
36 FEBRUARY 2022 | PROCESS & CONTROL
Manufacturers are at risk from increasingly sophisticated cyberattacks such as ransomware and malware. While Flint was cyber secure in general operations, it had not yet embraced IoT technologies. However, cybersecurity must come first in realising the benefits of increased connectivity and date-led automation. A comprehensive audit, based on the International Electrotechnical Commission's standard 62443 must form the basis of this strategy. This should be paired with expert analysis to identify risks, prioritise gaps and recommend steps for remediation.
Now, Flint is a fully digitised factory, where every machine is connected. This could only be achieved with a robust foundation of cybersecurity that includes anomaly detection, using AI and machine learning. Despite a 20% decrease in demand in 2020 due to COVID-19, Flint's operational efficiency improved by 5% compared to 2019 levels and productivity increased by 4% – the latter representing £240,000 in savings alone. However, the transformation also delivered a range of sustainability benefits. Water consumption was halved while improvements to efficiency associated with the installation of variable speed drives, smart panels, etc., led to a 15% decrease in electricity (KW/h) usage compared to 2019.
While businesses have the appetite and enthusiasm for future-proof sustainability, many are sitting with a blank sheet of paper. Right now, when future-proofing is a must-act strategy, knowledge is power - information and insight is your greatest asset.
Schneider Electric
www.se.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66