Cases & enclosures


Contactors, terminals, inverters and similar components are then installed. During this configuration process, the


electricians regularly consult their tablets to compare their work with the 3D model. Next comes the wiring. Last but not least, the fully wired mounting plate is fitted into the enclosures. Lauer has been with Meurer-etechnik for ten


years. Back when he was an apprentice, he still had to learn how to position each hole manually. “The technology has come a long way since then,” he says before asking his colleagues the following question: “So, what’s different about the AX?” The answer : “It feels like there’s more room on the gland plate.” And there is indeed 30 per cent more space for inserting cables. “That’s a huge advantage,” insists Lauer, because digitalisation is continuously increasing the number of components in the enclosure and thus also the


The AX’s doors and mounting plates are simply added to the delivery package and are quick to machine using the Rittal Perforex BC.


The Perforex cuts all holes using data from the digital twin. Interior fit-out is around 30 per cent quicker with the AX than with the predecessor model, the AE.


number of cables that need to be routed inside via the gland plate. He also takes a closer look at the interior wall


of the compact enclosure. “There always used to be problems with the interior fit-out, because there weren’t enough options for fitting the depth stays. That has now changed,” he notes. Being able to install the rails at a variety of heights makes the process of designing the levels more flexible. Lauer points to a grey box on one of the trolleys. There are now only three cable harnesses left in it. “Once the box with the cables starts looking empty, I know we’re on the finishing straight,” he says. There were no errors during testing, and the enclosures for the special-purpose machinery manufacturer were even ready half a day ahead of schedule. “You’re happy if, when you get to the end of the day, there’s no danger of failing to meet the delivery deadline and the quality is as it should be,” says a delighted Lauer.


Rittal www.rittal.co.uk


Instrumentation Monthly August 2021


www.rittal.co.uk - www.eplan.co.uk


23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78