FEATURE HAZARDOUS AREA EQUIPMENT Designing for hazardous environments


Top considerations for design and build in


hazardous environments


where they are not likely to exist under normal operating conditions. Any facility that uses or manufacture’s materials that may give rise to a flammable atmosphere, such as gas, mist, liquid and small fibres (dusts), may have a potentially explosive atmosphere and therefore fall into one of these six zones. Areas that do not fall under the six outlined categories are classified as non-hazardous or ‘safe areas’. Boulting Group’s qualified electrical engineers


which an explosive atmosphere may occur in quantities such as to require special precautions to protect the safety of workers.” It is vital that precautions are taken when constructing, installing and using apparatus in areas that have been defined as hazardous. In the UK, BS EN 60079 part 10-1 and part 10-2 are used to determine the area classification, a method of analysing the environment where explosive gas and or dust atmospheres may occur. The DSEAR scope is extended with BS EN


T


60079 part 14 detailing the design, selection and erection of electrical installations within a hazardous area and BS EN ISO 80079-36 to incorporate non-electrical sources of ignition and mobile equipment that could pose a risk.


IDENTIFYING HAZARDOUS ENVIRONMENTS Hazardous areas are classified under six zones. The three zones associated with gas are classified under Zone 0 and are areas where an explosive gas atmosphere is present continuously or for long periods of time. Zone 1 is an area where an explosive gas atmosphere is likely to occur in normal operation, while Zone 2 covers areas where an explosive gas atmosphere is not likely but if it occurs, will only exist for a short time. The other three zones are associated with


dusts, which are either flying and explosive, conductive or non-conductive. It is worth noting that 80 per cent of dusts are combustible. The associated three zones are Zone 20, an area where ignitable concentrations of combustible dust or ignitable fibers/flyings are present continuously or for long periods of time under normal operating conditions; Zone 21 an area where they are likely to exist under normal operating conditions and; Zone 22,


14 APRIL 2018 | ELECTRICAL ENGINEERING


he Dangerous Substances and Explosive Atmosphere Regulations 2002 (DSEAR), defines a hazardous area as “any place in


always visit a site before beginning work on a project to ensure the relevant protection systems are in place. By visiting the site beforehand and conducting the appropriate risk assessments, Boulting’s engineers can ensure that the build is specifically designed for that unique environment, taking into consideration any potential risks. As part of their role, Boulting ensures its engineers are aware of the latest legislation and safety requirements associated with the particular environment. Equipment should be designed in such a way


that it is stringently safe and includes current limiting devices to stop sparks. The equipment that will be used should be chosen and tested as early in the design process as possible. It must undergo a programme of rigorous checks and testing by a registered ATEX test house. ATEX is the name given to two European directives that aid in controlling explosive atmospheres. The first, Directive 99/92/EC (ATEX 137) assesses the minimum requirements for improving health and safety protection for workers in potentially explosive environments. Directive 94/9/EC (ATEX 95) looks at the laws concerning equipment and protective systems intended for use.


addition to constructing in a safer environment, modular builds reduce site disturbance, minimise waste, are more cost effective and allow for greater design flexibility. Construction of the overall build can also take place much quicker as modular builds occur simultaneously to the main build. Boulting Group’s mechanical and electrical prefabrication and modularisation services are completed at its onsite workshops and fabrication sites.


MAINTAINABILITY While ATEX testing is vital to identify and resolve potential risks at the start of a project, it is important that inspections continue to take place on a regular basis throughout the equipment’s lifespan. With the development of new software these inspections have started to incorporate risk based elements which are identified by HSE. This method of inspection looks at the type of protection used, the installation factors i.e. vibration, corrosive, outdoors etc in addition to common manufacturer/model failures. Engineers should factor in the production of a


schedule for periodic inspections at the design stage. At Boulting Group, we provide clients with a digital cloud based system where they can upload inspection schedules and what exactly needs to be checked. When it comes to physically undertaking these inspections, hand held devices can be used that allow engineers to upload information directly into their database. Many plant managers are now integrating this tool with their building information model (BIM) system, making the process easier to manage and permitting the production of incredibly concise reports.


VALUE ENGINEERING Value engineering is a methodology used to reduce unwanted costs, while improving the quality of a good or service. When engineers visit a site during the design process, it is important to look at all of the costs associated with equipment, not just the initial purchases. The installation, maintenance and running costs should all be considered and offset against each other. Spending more money on the initial purchase of equipment could not only mean it is easier to install and is more user friendly, it may also result in maintenance costs being lower in the long run. Investing in higher quality materials and


CONSTRUCTABILITY When constructing a new facility or working in an existing environment, it is important that the installation of new components is done using the most efficient techniques to reduce the risk of incidents. Modularisation is a technique often used by Boulting Group. This method sees equipment or parts of a facility built offsite and installed at a later date, taking the risk out of working on a hazardous site. In


equipment in the design and build phase can aid in increasing safety on a site. Higher quality equipment is less likely to breakdown, reducing potential risks posed by working in a hazardous environment. This is particularly important for cabling, which if not protected can result in a greater chance of sparks, leading to a catastrophic explosion.


Boulting Group www.boulting.co.uk





Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52