search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
TECH SPOTLIGHT


ABB Secures $120 Million Order to Power Jansz-Io Compression Project


ABB has won an order worth approximately $120 million to supply the overall Electrical Power System (EPS) for the prestigious multi-billion-dollar Jansz-Io Compression (J-IC) project. The order, comprising contracts with Chevron Australia Pty Ltd and with Aker Solutions, is booked in Q3 2021.


The Jansz-Io field is located around 200 kilometers offshore the north-western coast of Australia, at water depths of approximately 1,400 meters. The field is a part of the Chevron-operated Gorgon natural gas project, one of the world’s largest natural gas developments. The J-IC project, which moves gas from the deep seas to shore, marks only the third time that world-leading subsea compression technology is being deployed globally and the first time outside of Norway where ABB is also responsible for providing the EPS. The project will involve the construction and installation of a 27,000-tonne (Topside and Hull) normally unattended floating Field Control Station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island.


“The Jansz-Io Compression project is a major enabler in maintaining an important source of natural gas to customers in Asia Pacific. It will support energy transition across the region where many countries primarily rely on coal for


energy generation,” said Peter Terwiesch, President, Process Automation at ABB. “Burning natural gas produces around half as much carbon dioxide per unit of energy compared with coal. We’re proud to be leading the way in the global energy industry by pioneering innovative subsea power technologies that bring us closer to a carbon neutral future. This project reflects our close collaboration and trusted subsea history with Chevron and Aker Solutions.”


“This game changing technology significantly reduces power consumption and emissions compared to power generated offshore by local gas turbines and compressors located topside.” said Brandon Spencer, President, Energy Industries at ABB. “Subsea compressors are key to helping improve reservoir recoverability and ensuring optimal use of resources from existing fields.”


“This is a very important project for us as it supports our commitment to enable lower-carbon oil and gas production and


develop renewable solutions to meet future energy needs. We are pleased to once again be joining forces with ABB to take subsea solutions to the next level and accelerate the transition to sustainable energy production.” added Maria Peralta, Subsea Executive Vice-President at Aker Solutions.


ABB will provide the majority of the electrical equipment, both topside and subsea, for J-IC. The project will combine two core ABB technologies - power from shore and Variable Speed Drive (VSD) long step-out subsea power - for the first time. The electrical system will be able to transmit 100 megavolt-amperes over a distance of approximately 140 kilometers and at depths of 1,400 meters.


The contract was awarded following concept development and a front- end engineering and design (FEED) study. Work will start immediately and the subsea compression system is expected to be in operation in 2025.


September 2021 www.sosmagazine.biz 49


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52