| Powering Australia
on the same site as the original proposal, approximately 220 km east of Port Hedland and 270 km southwest of Broome, in the northwest of Western Australia, with the following main
revisions: ● addition of downstream processing facilities using seawater and renewable power to produce green hydrogen and ammonia as stored renewable energy, replacing the transmission of power to south east Asia via HVDC link, as in the original proposal;
● export power cables of the original proposal replaced with desalination plant intake and discharge pipelines, and ammonia product export pipelines and loadout, extending into Commonwealth waters to ship loadout facilities approximately 20 km offshore;
● expansion of the solar arrays compared to the original proposal;
● replacement of fly-in/fly-out or drive-in/drive out construction and operations workforce models with construction of a new company town to accommodate the revised proposal workforce; and
● provision of at least 3 GW of power generation capacity to be reserved for use in the Pilbara. The revised proposal would be implemented within a development envelope a little bigger than that of the original proposal (668 100 ha vs 662 400 ha, a 0.8% increase).
In May 2021, in line with the Environment Protection and Biodiversity Conservation Act (EPBC Act), referral documentation was submitted to the Australian government Department of Agriculture, Water and the Environment. In June 2021, a ministerial notification said that the updated project scope as submitted in the referral was “clearly unacceptable” (issues of concern being the Ramsar wetlands and listed migratory species). A spokesperson for bp told Modern Power
Systems that “the environmental concerns identified by the Australian government are being considered by the project design team to find solutions ahead of resubmitting a revised proposal.”
It remains to be seen how the project will be impacted by the recent change of government in Australia and by reorganisation of relevant government departments, with the Department of Agriculture, Water and the Environment
becoming, as from 1 July 2022, the Department of Agriculture, Fisheries and Forestry, with some of its functions moving to the new Department of Climate Change, Energy, the Environment and Water. But bp is presumably confident that things are moving sufficiently in the right direction to justify its stake in the project.
Brown hydrogen pilot project concludes
Meanwhile, in Victoria, the HESC (Hydrogen Energy Supply Chain) pilot project – focused on hydrogen production via a very different route – namely lignite gasification – followed by liquefaction, and export by ship to Japan, has been concluded and a report published summarising the key findings.
The HESC pilot project started in 2018 with the announcement of the plan to build a gasification plant in the Latrobe Valley and a hydrogen liquefaction plant in Hastings. By mid-2019 development approvals for the pilot project were secured and construction commenced. A major milestone was achieved in January 2022, when the Suiso Frontier, the “world’s first liquid hydrogen carrier ship”, left Hastings with its cargo of liquid hydrogen and in February was safely unloaded at the receiving terminal in the port of Kobe, Japan. This “marked the successful completion of the HESC pilot project.” The project was created as a partnership between the governments of Japan, Australia and Victoria and industry partners in Japan and Australia: Kawasaki Heavy Industries, Ltd (KHI); Electric Power Development Co (J-Power); Iwatani Corporation; Marubeni; AGL; and Sumitomo. Shell, ENEOS and Kawasaki Kisen Kaisha (K-Line) were involved in the Japanese portion of the project.
The governments of Australia and Victoria contributed $100 million in funding to the $500 million total, the rest coming from the Japanese government and the project partners. The Latrobe Valley facility, operated by J-Power, comprised a small-scale, purpose-built gasification and refining plant.
Hydrogen gas from the Latrobe Valley plant was transported via existing hydrogen tube trailer trucks to Hastings, to be liquefied. The plant achieved successful production of 99.999% pure hydrogen gas via gasification
of Latrobe Valley lignite and successful production of 99.999% pure hydrogen gas from gasification of a mix of biomass and Latrobe Valley lignite.
The liquefaction plant at Hastings received hydrogen gas, chilled it down to -253° Celsius and compressed it. At this temperature and compression, the hydrogen becomes liquid, occupying 800 times less volume than hydrogen in gaseous state.
The Hastings hydrogen liquefaction plant, Australia’s first such facility, was operated by KHI and Iwatani.
While the Australian end of the HESC supply chain was being built, the Japanese end of the HESC supply chain was also being established. A receiving terminal and storage facility was established in Kobe and KHI built the Suiso Frontier, the world’s first ocean-going liquid hydrogen carrier ship.
The facilities built for the pilot are available for use in for further hydrogen R&D, with several research and commercial organisations reported to be seeking access to the Hastings liquefaction plant to conduct further trials.
HESC says its longer term vision is “to produce carbon neutral hydrogen through extraction from a mix of Latrobe Valley coal and biomass, capturing and storing CO2
via the CarbonNet
Project and optimising energy efficiency in the HESC supply chain.”
Over the next few years, the project partners say they will review the pilot phase results and continue to engage with local communities, regulators and potential customers hydrogen, “in readiness to build and operate a commercial- scale project.”
Main activities will be: continuing testing
and demonstration of maritime liquid H2 transport, with the Suiso Frontier making further trips between Australia and Japan; preparing for regulatory approval processes; investigating the economics and business model of the commercial-scale project; engaging potential ‘off-takers’ in Australia and Japan; and improving technologies to “reduce costs and carbon intensity across the supply chain”, including further development of the ortho- para conversion catalyst for producing liquid hydrogen, in partnership with CSIRO (Australian national science agency).
Suiso Frontier, world’s first ocean going liquid H2
carrier ship
www.modernpowersystems.com | July/August 2022 | 11
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93