Operation & maintenance |


Below: Aerial view of Wudongde, China Courtesy GE


j commercial operation on June 24, 2021, following the provisional acceptance marking the transfer of ownership between the project owner (Ministry of Energy and Environment of the Republic of Guinea) and the operator Société de Gestion et d’Exploitation de Souapiti (SOGES). Tractebel’s mandate, as assistant to the


project manager, was awarded by Guinea’s ACGP (Administration et Contrôle des Grands Projets). The mission included assisting with the initial works on the Souapiti hydroelectric development project, revision of the Environmental and Social Impact Study and the Resettlement Action Plan, and a complete portfolio of control and supervision duties. The project is a result of the renewal of the Control and Supervision contract based on the success of the Kaléta scheme, for which Tractebel was Owner’s Engineer from 2011 – 2015. A major advantage of the Souapiti dam is its capacity


to regulate inflows of the Konkouré River. At 116m high, 1.2km wide and a volume of 3.7 million m3


of concrete,


the dam is the largest roller-compacted concrete (RCC) gravity dam in West Africa. Its reservoir contains a colossal 6.5 billion m3


Below: Francis turbine generator at Wudongde Courtesy GE Renewable


annual inflow of the river (12 billion m3


of water, over half the average .) By regulating


the river flow to the downstream Kaléta hydropower scheme, Souapiti significantly increases Guinea’s overall


hydroelectric capacity. Currently equipped with four turbines totalling 450MW, Souapiti will supply around 1900GWh/year to the Guinean electricity network, plus increase electricity production of the Kaléta plant by an additional 200GWh/year. Construction of the dam is expected to be finalized in July 2022. The first studies of the development of the Konkouré


date back to the 1920s. Between 1945 and 1950, the overseas services of Electricité de France, assisted by Coyne and Bellier (the former name of Tractebel in France), carried out a complete inventory of the hydroelectric sites of the Konkouré, including Kaléta and Souapiti. The project continued through 1958, including major field reconnaissance campaigns and the start of work on the Souapiti-Kaléta complex. This consisted of a rockfill dam with an underground power plant in Souapiti, followed by a 6km-long tunnel to transport the turbinated water downstream of the Kaléta falls. The work was halted in 1958 when Guinea rose to independence. The project remained at a standstill until 2011, when the Ministry of Energy and Environment of the Republic of Guinea signed an engineering, procurement, and construction (EPC) contract for the construction of Kaléta with China International Water & Electric Corporation (CWE). In August 2015, the Kaléta hydroelectric power plant entered into operation, with a capacity of 240MW. CWE then proposed to carry out the hydroelectric development project of Souapiti, located 6 km upstream. The contract was signed in January 2016 and 85% financed by Exim Bank. The Souapiti hydroelectric development was


approved on June 24, 2021 by new client SOGES. The company, 51% owned by the Republic of Guinea and 49% by the contractor CWE, is responsible for the operation, maintenance and upkeep of the Souapiti hydroelectric development for a period of 25 years. SOGES has concluded an energy purchase contract with the company Energie de Guinée (EDG), responsible for distribution via Guinea’s national network.


“With both the Souapiti and Kaléta hydropower schemes in place, Guinea has access to abundant


26 | October 2021 | www.waterpowermagazine.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53