| Lessons learned


Left: All stakeholders need to be involved early on in discussions about reservoir discontinuance. Such redundant facilities can still be of great value to local communities, and they may have strong views about future plans


Reference


Lessons learnt from reservoir discontinuances with Ryan McHugh from Mott MacDonald and Michael McAree from Mott MacDonald Bentley. British Dam Society lecture. 2 October 2023. https://www.ice.org.uk/ events/past-events-and- recordings/recorded-lectures/ lessons-learnt-from-reservoir- discontinuances


residents, the Royal Society for the Protection of Birds and other such organisations, plus national and regional parks. Frank conversations with third parties need to be carried out in the early stages and engagement with enforcement authorities, environment permitting teams, key stakeholders is encouraged as quite often stakeholders, even within the same organisation, can have competing interests. There also needs to be an understanding of legal implications for post-discontinued reservoirs such as land ownership, legal constraints, plus compensation to the watercourse and its reliability. Other factors to consider during the detailed design are whether any water needs to be retained in the reservoir, as this can provide benefits for the local environment, ecology, and wetland birds etc, as well as helping to dampen the peak of floods. Fish passage and the increased risk of flooding both during construction and afterwards also need to be considered as downstream risks will be changing. There also need to be plans in place for excavated


material. Is there space for it or issues with land ownership or change of land use? Are material management plans required and can vehicle movements be minimised during the project? The export of material usually has substantial costs and causes disturbances to surrounding third parties and may trigger an environmental impact assessment.


Scottish studies Case studies were given from Scotland where Scottish


Water has 250 reservoirs and 73 are no longer used for supply. Sixty-six of these are deemed as high risk and need ongoing maintenance, pose a risk to public and


are impacting river restoration. Many lessons were learned from the experience gained at Pundeavon Reservoir which was the first major dam to be discontinued by Scottish Water in 2016. Originally built for public water supply, this 15m high earth embankment dam with a reservoir surface area of 40,000m2


and volume of 268,000m3 , was no


longer operational. There were potential concerns about the condition of the outlet pipe and lack of available freeboard.


Discontinuanace was formed with a V-notch


through the embankment and less than 10,000m3 of water was retained in the reservoir basin. In order to control inflows during construction a new by-wash channel was formed around the north side of the project, tying into the spillway channel. During construction there was a major silt release in the first attempt at discontinuance in 2015, and so consequently Scottish Water implemented a drawdown protocol to be followed. There was a lot of public support for discontinuing Mill Glen Reservoir in 2021. This 10.7m high earth embankment with clay cores was built for public water supply, with a 50,000m2 150,000m3


reservoir surface area and of volume, but was no longer operational.


It had a history of spillway erosion, vegetation issues, problems with outlet structure and two fatalities had also occurred there in 2013. Discontinuance of Helensburgh No.2 Reservoir is still underway. This 8.5m high earth embankment with a clay core was once again built for public water supply (50,000m2


Below: A bird warden for the RSPB. Stakeholder engagement is paramount to discussions about reservoir discontinuance © Tony Skerl / Shutterstock.com


surface area and 230,000m3


volume) but is no longer operational. A valve tower bridge collapsed in 2012 and the reservoir been empty since then, and the basin rewilded.


www.waterpowermagazine.com | April 2024 | 15


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45