| Contents regulars Cover Story
Dr Quentin Shaw looks back on the implementation of the 275m double- curvature conventional mass concrete arch Yusufeli Dam in Turkey
5 World News
Sustainable hydropower ‘essential’ for Latin American and Caribbean clean energy goals; Floating solar installations at hydro projects
features 18 20 28 30 10 Spotlight
New research attempts to identify where hydropower stations could be sited with the least environmental impacts
Classified
48 51
Contacts
32
Africa 12
16
Building on African potential
Tracking hydropower projects currently under development
Time for change? Dr Quentin Shaw shares his experiences in the industry and comments on the development of dams in Africa
41 18 20
Making progress The Lesotho Highlands Water Project Phase II is on track
High time Climate change impacts are being felt more keenly by African countries that are sharing water resources for hydropower generation.
44 24
Failing African tailings Following the failure of two more tailings dam, mining companies are urged to meet the Global Industry Standard on Tailings Management
Small hydro 26
36 Dollars and developments
New hydro for South Georgia
New Gilkes turbine installed on the island of South Georgia
28 Investing in small hydro
Small hydro projects added to growing renewable portfolios
Engineering 30
Spotlight on developments and investments
Planning & projects 40
Lessons learned from emergency concrete repair
The complexities of dealing with emergency repairs
32 Future fears
Review focuses on the lack of qualified UK reservoir engineers
Pumped storage
34 Tools at the ready Tom Clegg reflects on the pumped storage landscaper
42
Environmental focus Research studies have been focusing on the environmental credentials of hydropower.
Meeting the challenges With IRENA emphasising the importance of refurbishment, IWP&DC takes a look at some of the latest projects undergoing modernisation
44
Composite pipe repair system
Yusuke Nishi describes Belzona SuperWrap II, including details of various tests conducted on the system to comply with both ISO 248171 and ASME PCC-2 (Article 401)2, the two major international standards for composite pipe repair
Next issue Climate change mitigation; dam safety initiatives; new opportunities in the industry; project design; the importance of refurbishing existing projects @waterpowermag
©Progressive Media International ISSN 0306-400X
www.waterpowermagazine.com | March 2023 | 3
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53