The Snowy 2.0 project is the largest commitment to renewable energy in Australia. Herrenknecht has delivered one Multi-mode TBM and a Mixshield TBM (11.010 mm) both highly customized to the demands of the project. The two machines will drill a total of approximately 21 kilometers through varying rock types and from −6 to 25 degrees connecting two existing dams to a power station, bringing renewable energy infrastructure to the next level. herrenknecht.com/snowy