WTC 2025 | PREVIEW
Below:
Sofia station, mezzanine level about 90m connected by shaft up to Stigbergsparken, (from Coordination model in Tender documents) SOURCE: TYPSA/ALEJANDRO CANTARERO
Bottom:
Stockholm metro with permanent SCL tunnels, permanent rock bolts PHOTO CREDIT: ALUN THOMAS
Lunch
Session 2: Sustainable Underground ● Global and local environmental impacts of tunnelling ● Carbon footprint evaluation and carbon emission reduction
● Resource efficient tunnelling - groundwater and excavated material management
● Rock fracture grouting for minimising environmental impact
DAY 2 (10 MAY) Session 3: Concept to Construction - progressive
approach to difficult ground ● Different phases in Progressive Project Design ● Specific investigations in difficult ground conditions and choice of tunnelling method
● BIM as a tool for handling uncertainties in difficult ground conditions
● How to prepare conditions for proper monitoring and asset management
Lunch Session 4: Future of Tunnelling - smart
technologies and innovative approaches ● Smart systems and smart monitoring in tunnelling ● Worksite management and useful tools (safety, production efficiency and traffic awareness)
● Structural inspections and new robotics applications ● Perspectives on AI in design and construction
Q&A Round Table: The future of tunnelling
The ITACET training course can be registered for only, or it can be in combination with the full congress, and a technical tour following after (see below).
46 | March 2025
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53