PNP OTEK'S I&C DIGITIZATION IN ONE OUTAGE!©
ELECTRIC GENERATOR
PNP-Y STEAM GENERATOR PNP-W PNP-Y (E.P.) OR PNP-U PNP-W PNP-U PT & CT
OPTIONAL C.L. TRANSMITTERS Distribution Panel
SCADA/DAS SECTION
CONTROL OUTPUTS
PANEL MOUNT
4-20 mA Output
< 2 MILES (3.3 KM) 14 GAUGE
SHILEDED.TWISTED PAIR (SEE P. 23)
IMPORTANT NOTES: 1. OTEK is CLASS IE, APP. B & Mil-Spec since 1974. 2. NTM & UPM are NEI08-09 compliant. PNP has NO C.D.A. 3. Either PNP or NTM upgrade can be done in ONE (1) outage 4. Both NTM & PNP can be used with SCADA, DAS or stand alone. 5. PNP replaces 100% F,F&F any analog/digital meter, any size and shape within three minutes and eliminates multi-spare inventory with one!
IMPORTANT NOTES: 1. OTEK is CLASS 1E, APP. B & Mil-Spec since 1974. 2. NTM & UPM are NEI08-09 compliant. PNP has NO C.D.A. 3. Either PNP or NTM upgrade can be done in ONE (1) outage. 4B th NTM& PNP
b d ith SCADA DAS t d l COMPLETE DIGITIZATION IN ONE (1) OUTAGE?
DESCRIPTION: FOR SCADADAS: Use NTM & UPM. add serial I/O (USB, RS485 or Ethernet) wiring, either control your process with the NTM/UPM control (relay, Mosfet & Current Loop) outputs as commanded by your SCADA or as programmed at the NTM/UPM. Use existing power and signals on your I&C. For DAS: just add the serial I/O wiring. FOR PNP: Use the current loop signal in series with the display in your I&C room, continue the two wires to the SCADA/DAS section (or room) and control all process with the SCADA or... Use the PNP controlling outputs (Digit 10) for control of existing loads & wiring!
HOW DO WE DO IT? 1. Replace existing analog/digital meters w/o any changes to existing wiring, signal, mounting, or operators except the old meters.
2. Replace your existing >SIM USD "spares" inventory with ~ S50k of PNP
3. Increase your proht & R.U.I with our high accuracy, resolution, and reliability technology by at least 2%.
4. The transmitter converts all signals to 4-20mA for ALL loop power (PowerlessTM) meters (only one model required) and feed the same signal to your SCADA/DAS for full control of your plant.
5. Eliminate multi-million and years for new building, new I&C/simulator, cyber security approvals and replacement of existing operators
6. Our PNP can be easily assembled (all plug-in), tested and installed on land or high seas in emergency situations 7. Are we WRONG? Read EPRI MTA # 3002020578
NTM CATALOG PNP VIDEO
OTEKCORP.COM PNP CATALOG
IN C.L.
WITH PNP & ANALOGS
DIN RAIL MOUNT
IN OUT EXISTING I&C ROOM
EPRIMTA STUDY PNP POWERPOINT
INTELLIGENT INSTRUMENTS
4016 E. TENNESSEE ST. | TUCSON, AZ 85714 | USA Tel: +1 520-748-7900 | Fax: +1 520-790-2808
www.otekcorp.com
see inside back cover
UPM CATALOG
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49