search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
28


The impact of sustainability on value


Case study


1 Triton Square, London


British Land have recently embraced the circular economy in their refurbishment of 1 Triton Square. Developer: British Land Size: 310,000 sq ft Completion: 2020 BREEAM rating: Outstanding Tenants: 100% pre-let to Dentsu Aegis


In reusing existing materials and components, British Land minimised embodied and operational carbon, reduced the cost of construction and sped up the development process.


Key attributes


• Doubled the building footprint with no additional plant


• Maximised the retention of existing structure and building fabric


• 56% embodied carbon savings vs typical new build


• 43% operational saving vs typical commercial building


• 66% cost saving on circular façade v new equivalent 0.3%


additional capital expenditure to take building from equivalent of BREEAM Excellent to BREEAM Outstanding


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34