Provision Requirement 5(1)


Schedule 1, Part 3, Requirement 5(2)


Schedule 1, Part 3, Requirement 5(3)


Schedule 1, Part 3, Requirement 5


How change is to be made substitute


After “HVAC offshore collector stations”, insert


After “HVDC offshore converter stations”, insert


After sub-paragraph (3), insert


Text to be substituted, inserted or omitted


option or two for the HVAC option (whether constructed under Work No. 1 or Work No. 2)”


“for the HVDC option” “for the HVDC option”


“(4) The dimensions of any HVAC offshore collector stations for the HVAC option forming part of the authorised development (excluding towers, helipads, masts and cranes) must not exceed 60 metres in height when measured from LAT, 75 metres in length and 120 metres in width”


Schedule 1, Part 3, Requirement 6(1)


Schedule 1, Part 3, Requirement 6(2)


Schedule 1, Part 3, Requirement 6(3)


Schedule 1, Part 3, Requirement 6(4)


Schedule 1, Part 3, Requirement 10(3)


For “400 kilometres”, substitute For “680 kilometres”, substitute For “24,000 metres3”, substitute For “3,000 metres3”, substitute


For “79 metres AOD and no external electrical equipment comprised in Work No. 39 shall exceed 64 metres AOD”, substitute


Schedule 1, Part 3, Requirement 10(4)


For “85 metres in width”, substitute Schedule 1, Part 3 After Requirement 34, insert


“400 kilometres for the HVDC option and 250 kilometres for the HVAC option”


“680 kilometres for the HVDC option and 350 kilometres for the HVAC option”


“24,000 metres3 for the HVDC option and 15,000 metres3 for the HVAC option”


“3,000 metres3 for the HVDC option and 3,000 metres3 for the HVAC option”


“79 metres AOD for the HVDC option and 75 metres AOD for the HVAC option and no external electrical equipment comprised in Work No. 39 shall exceed 64 metres AOD for the HVDC option and 69 metres AOD for the HVAC option”


“85 metres in width for the HVDC option and for the HVAC option”


“Transmission system 35.—(1) Prior to commencement of construction of the authorised development, the undertaker must give written notice to the Secretary of State, the relevant planning authority and the MMO detailing the selection made by the undertaker under Work No. 1 to construct either the HVDC offshore wind farm, using the HVDC option, or the HVAC offshore wind farm, using the HVAC option. (2) Where under sub-paragraph (1) the HVAC option is selected, the written notice shall also specify whether the HVAC collector stations