Provision
How change is to be made
Text to be substituted, inserted or omitted protection equipment devices (disconnectors, circuit breakers), harmonic filters, cables, lightning protection masts, control buildings, communications masts, back-up generators, access, fencing and other associated equipment, structures or buildings;”
Article 33(1)(a)
Schedule 1, Part 1, paragraph 1, “Work No. 1”
For “document reference 2.3(a) sheet 1-4 Sep-13 rev C;”, substitute
In sub-paragraph (a) for “240 wind turbine generators each fixed to the seabed”, substitute
“document reference 2.3(a) sheet 1-2 May-15 rev D; document reference 2.3(a) sheet 3-4 Sep-13 rev C;”
“240 wind turbine generators for the HVDC option, or if the HVAC option is selected, an offshore wind turbine generating station with a gross electrical output capacity of up to 750 MW comprising up to 150 wind turbine generators. For both the HVDC option and the HVAC option, each wind turbine generator shall be fixed to the seabed”
In sub-paragraph (b) for “three HVAC offshore collector stations fixed to the seabed”, substitute
In sub-paragraph (c) for “up to 1 meteorological mast”, substitute
Schedule 1, Part 1, paragraph 1, “Work No. 2”
Schedule 1, Part 1, paragraph 1, “Work No. 3A”
For “two HVDC offshore converter stations fixed to the seabed”, substitute
For “four HVDC export cables between Work No. 2 and Work No. 3B”, substitute
“three HVAC offshore collector stations for the HVDC option. Up to two HVAC offshore collector stations for the HVAC option, if constructed under Work No. 1, each fixed to the seabed”
“up to one meteorological mast”
“two HVDC offshore converter stations for the HVDC option or, if not constructed under Work No. 1, up to two HVAC offshore collector stations for the HVAC option, each fixed to the seabed”
“four HVDC export cables for the HVDC option between Work No. 2 and Work No. 3B, or up to two HVAC export cables for the HVAC option, between either Work No. 1(b) and Work No. 3B, orWork No. 2 and Work No. 3B,”
Schedule 1, Part 1, paragraph 1, “Work No. 39”
Schedule 1, Part 1, paragraph 1, “Work No. 39A”
Schedule 1, Part 1, paragraph 1, “Work No. 41”
For “an onshore converter station to the north west”, substitute
For “temporary” in both places, substitute
For “two cables”, substitute Schedule 1, Part 3, For “must not exceed five”, 6
“an onshore converter station for the HVDC option or an onshore HVAC substation for the HVAC option, to the north west”
“permanent” “six cables” “must not exceed five for the HVDC