search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
36 PROJECT REPORT


ENVIRONMENTAL CONSIDERATIONS As with most modern developments, sustainability formed an important driver for the project. The site is located within the Chilterns Area of Outstanding Natural Beauty, so a delicate approach to the landscaping was crucial. “We implemented an empathetic landscape-led approach to the design,” O’Hare says. “Environmental considerations were prioritised at every phase, from design through to construction and operation.” There were a lot of mature trees on the site and these were retained as much as possible – “It’s really good when you see the end product,” he says. The site features a lot of green space, with walkways and paths throughout to encourage residents to utilise the space and socialise. “It’s very much designed to create a community, with allotments to allow people to garden and maintain outdoor activities. ”


WWW.HBDONLINE.CO.UK


SUSTAINABILITY Wycliffe Park has achieved a BREEAM Very Good rating. The design measures that contributed to this partly stemmed from a focus on climate change adaptation. Both thermal comfort within the blocks and clubhouse, and the measures taken for minimising flood risk, were designed with an allowance for the possible impact of future climate change. Local air quality benefits were maximised with no NOx systems specified, and low flow fittings were specified for water outlets resulting in a 25% reduction in water use against the BRE baseline. Reducing carbon was a priority from the outset, so through careful planning the site was connected early on to the grid, and a renewable energy tariff procured. “Two temporary building supplies were installed which provided the site with 2.096 MW of 100% renewable electricity,” O’Hare explains.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76