EXTERNAL ENVELOPE 51
Clearly ready for the FHS
Paul Higgins of TuffX explores glazing options for meeting the demands of Part O but also the upcoming Future Homes Standard, on aesthetics and function
D
uring an era of change in the construction, we are also at a pivotal moment when it comes to glazing – and there are now a variety of glazing options which have been specifically designed to be future-focused. The latest Building Regulations, including Document L, Document O and the incoming Future Homes Standard (FHS), are part of an ongoing and focused drive towards net zero in 2050; ultimately, the performance of our glazing products is only going one way – up.
The relatively new Approved Document Part O, designed to tackle overheating, is
ADF OCTOBER 2024
driving change. The Document seeks to ensure that the design and construction of new residential buildings limit unwanted solar gain in summer and, if required, provide adequate means to remove heat from the indoor environment. This is becoming more of an issue with the heatwaves the UK has experienced in recent years.
Solar glass solutions To deliver the comfortable ambient interior temperature occupants are looking for, without the need for air cooling technologies, high-quality solar glass
WWW.ARCHITECTSDATAFILE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76