search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PROJECT REPORT: TALL BUILDINGS


43


© BIG | Bjarke Ingels Group


Virtual reality came into its own when this space was being designed, says Yang: “When you’re working with experienced people, everybody knows what an efficient office floor design looks like. But with the kind of green space no-one had seen before, we started doing VR renderings and walkthroughs for the clients.” He adds: “The first time they put the headsets on and experienced the space, the reaction was ‘oh my god, what are we doing!”


Sustainability


In addition to being naturally ventilated, the central atrium and other public spaces receive recycled, cool ‘spill air’ from the air conditioned office spaces to offset heat and humidity; an example of where the architects have tried to use passive design approaches where possible. There are 77 bike spaces in the basement and 88 on the ground floor, with the client having “a strong desire to promote bike use,” as well as a bike lane planned directly adjacent to the plot, and lockers


ADF NOVEMBER 2021


and changing facilities in the ground floor podium as well as in the basement.


Conclusion The Partner-in-charge Brian Yang says that in 2019 he was “probably in Singapore nine times, making sure things were going smoothly onsite.” He says it’s been a “big shift” to doing everything virtually, and is keenly looking forward to being able to visit the completed building when safe to do so. “At least the virtual working was on the later stages,” he says, explaining that BIG had by the stage become “very familiar” with the client and contractor, plus the local delivery architects RSP and “developed a good working relationship. Otherwise it could have been more difficult as it is with anything of such high ambition”. He concludes that albeit from this remote distance, looking at social media activity, “it feels that people are excited about the building, I can’t wait to actually be there to see it, having had the opportunity to contribute to Singapore’s city building.” 


© Fabian Ong


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84