search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
20


INSIGHTS


reminiscent of the local fenland character. As well as attracting and retaining staff, this provides efficient links to new town facilities and importantly, transport.


Isolated workplaces which are divorced from amenities have become unthinkable nowadays. Good transport linkages and access to town centres or their facilities are fundamental to the success of a business park. The Waterbeach site is located adjacent to a vast new town development including shops, bars, residential and a new railway/bus station. The proposal also includes excellent covered, secure cycle parking which far exceeds the national standards, with changing shower facilities linked to the cycle network and public transport together with a green travel plan to provide bus facilities to reduce reliance on cars alone. Parking spaces will be prioritised for electric vehicles and employees involved in a car sharing scheme. Despite the inclusion of adequate parking, the proposal is landscape focused, with the majority of parking concentrated to the rear of the site. This maximises the impact of the soft, green landscaping, and ‘waterscape’ setting.


Work culture shift


A big shift for the business park is also in work culture. The first examples were devised for a nine to five working day, however, post-pandemic flexible working requires a shift in our understanding of the workplace. Staff need to be enticed by an attractive and stimulating change of scene from their desks at home, as a place for collaboration that will engage the best staff. The work setting promotes a lifestyle, while enabling a sensible work/life balance. Flexible low carbon workplaces that are naturally lit and ventilated improve wellbeing and, in turn, positively impact a company’s employee retention.


WWW.ARCHITECTSDATAFILE.CO.UK


In this project, detailed materials research and appraisals determined the most appropriate, low impact materials to be included in the building, including those which have the potential to store carbon throughout their life cycles. Natural materials such as timber, sheep wool, straw and cellulose (recycled paper), all by-products of much larger industries, are available locally and have the potential to be used within the building design, especially for insulation. Additionally, hemp, which is a great absorber of carbon, is being considered as the liner for a prefabricated wall panel; to offer the benefit of naturally modulating internal temperatures as well as carbon sequestration.


The holistic approach to sustainable design also goes far beyond the tangible elements, such as material choices, construction methodology and energy sources. The ethos of the brief and design proposal needed to persuade the post-pandemic worker that there are clear and healthy benefits (both physical and mental) to going back to the office. This includes the camaraderie, discussion, collaboration, social stimulation and opportunities to break the pattern of the day with sporting or recreational activities. Forward thinking, socially responsible businesses are keen to promote a commitment to sustainability, and are more discerning about their working environment. This will attract an environmentally conscious workforce who appreciate the sustainable benefits of their workplace.


The business park of the future can play a key role in establishing new workplace models and many of those existing business parks are capable of being remodelled, just like we have at Cambridge, to make a truly positive impact on the climate crisis.


Martin Williams is managing director of Saunders ADF APRIL 2022


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84