Appointments & News 25


Arma metal pipe boxing for energy effi cient heating


W


ith carbon reduction and energy effi ciency driving the installation of cleaner heating solutions, the need


to conceal exterior pipework and associated components forms an essential part of the fi nal solution, which helps improves aesthetics while adding a level of physical protection to the system. Concealing exposed pipework can present


a range of challenges for social landlords and contractors, as part of carbon reduction programmes, as the boxing not only has to be aesthetic and easy to install but must also be cost eff ective. While most interior pipe casing and boxing


projects can be addressed with pre-formed and pre-fi nished plywood boxing, for exterior pipework, this solution is not practical or recommended, due to its lack of weather resistance, which is where Encasement’s Arma metal pipe boxing provides an ideal solution.


COVERING & PROTECTING De-carbonisation and the move toward net zero goals have already resulted in the growing use of low carbon district heating schemes, as well as air- source heat pump installations, and ground source loop arrays, so versatile and durable pipe protection is an essential consideration.


is dependent on the specifi cs of each project, so the pipe boxing also needs to be adaptable to meet these diff erent project layouts. Other aspects, such as ease of installation and the choice of fi nish are also considerations when specifying metal pipe boxing to conceal energy effi cient heating system installations.


EASE OF INSTALLATION & MAINTENANCE As Arma metal boxing is bespoke manufactured from strong, lightweight and corrosion resistant aluminium, to the dimensions and requirement of individual projects, this not only helps simplify the installation, but helps provide an integrated fi nish while also protecting the pipework from damage or tampering. Two fi xing options are available for Arma profi les


with either an external fl ange or concealed angle bracket, both of which can be readily secured to external walls with suitable fi xings. Access for


Retrofi t heat networks typically require large


quantities of lagged pipework to be secured to the exterior walls of properties, oſt en rising several storeys on a residential block before the distribution pipework branches off to serve each fl at. For air source or ground source heat pump


installations, the length of pipework required is usually considerably less than a large district heat network, but metal pipe boxing is used for precisely the same reasons - to conceal and protect pipework, which in most cases are located close to the ground and within easy reach. Clearly, the location and routing of the pipework


Housing Management & Maintenance Spring 2026


FINISHING – BLEND OR CONTRAST PPC fi nishes in any BS or RAL paint colour can be specifi ed to contrast or blend in with wall colours and surroundings, while a range of dedicated accessories is also available, which include internal and external corners, as well as joint covers and end caps. A supply and install service from Encasement


is also available on the Arma product range to provide specifi ers and main contractors with a professional, expert solution that helps simplify the installation process.


01733 266 889 www.encasement.co.uk


routine inspection and maintenance can also be incorporated into the metal boxing with the use of hinged doors or removable panels.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52