search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
LOW CARBON ENERGY


Healthcare St James’s


University Hospital Public Education


Leeds Beckett University


Trinity Academy Leeds


Public Civic Hall


Leeds City Museum


City Art Gallery &


Central Library Town Hall Quarry House


Table 1: Connections off the Leeds PIPES Heat Network.


hospital’s Beckett Wing has already been connected to the network. A further 10 buildings are proposed to be connected in the next financial year using funding secured via PSDS Phase 3 applications. These connections reduce demand on the central site heating infrastructure, thereby reducing fossil fuel demand.


Heat pump installation A significant heat pump installation was added to the central site services. The heat pump installation and extension of the on-site LTHW network allow for increased efficiencies, and utilisation of the waste heat from the Combined Heat and Power (CHP) plant. The low carbon network provides heat


at temperatures compatible with the existing distribution temperatures on site. Existing central site heating plant will be retained for back-up and resilience while the changeovers are being undertaken. Additionally, the reduction in carbon through switching to lower temperatures is part of the Trust’s decarbonisation strategic plans, and positively impacts the trajectory in achieving its milestones, as set out in its Green Plan to meet the 2032 target for an 80% reduction in carbon emissions associated with energy consumption.


Public Sector Decarbonisation Scheme As stated on the Government (gov.uk) website (https://tinyurl.com/299wrxv7), the Public Sector Decarbonisation Scheme supports the aim of reducing emissions from public sector buildings by 75% by 2037, compared with a 2017 baseline. Phase 1 of the Public Sector Decarbonisation Scheme provided £1 bn in grants over the financial years 2020-2021 and 2021-2022 as part of the Chancellor’s Plan for Jobs 2020 commitment to support the UK’s economic recovery from COVID-19. It aimed to support up to 30,000 jobs in the low carbon and energy efficiency sectors, and reduce carbon emissions from the public sector. Phase 2 of the Public Sector Decarbonisation Scheme provided £75 m of grant funding for the financial year 2021-2022. It had a stronger focus on


38 Health Estate Journal May 2023


heat decarbonisation than Phase 1, in order to deliver greater carbon emission reductions. It supported the public sector in taking a ‘whole building’ approach when decarbonising its estates.


Phase 3 of the PSDS Phase 3 of the Public Sector Decarbonisation Scheme will provide £1.425 bn of grant funding over the financial years 2022-2023 to 2024-2025. Phase 3a and 3b have closed for


applications, but the next application window (Phase 3c) is expected to open to


Chris Kelly


Chris Kelly is an associate director – Estates Compliance and Risk, at Leeds Teaching Hospitals NHS Trust. With 14 years’ experience across three Trusts, he is a key member of the Estates and Facilities senior leadership team at one of the largest, most complex acute Trusts within the NHS. He has lead responsibility for the Estates Decarbonisation Strategy ‘Roadmap to Net Zero’. As the lead for Compliance and Risk Management across all internal and external physical assets and the associated backlog maintenance (Critical Infrastructure Risk), he supports the delivery of high-quality services, buildings, and their environments, across the five-hospital Estates portfolio.


Alison Ryan


Alison Ryan, deputy Healthcare lead at Mott MacDonald, is a Chartered Engineer with over 20 years’ experience of hospital design work, project management, and delivery of many complex projects in the UK. She has been an IHEEM Council Member since 2019, is a former Chair of the IHEEM National Professional Development Committee (between 2013 and 2018), and former Chair of the IHEEM Yorkshire Branch (between 2011 and 2013). She is IHEEM President for 2022-2024.


Mike Cooke


Mike Cooke, MD – North & Scotland at Vital Energi Utilities, has 27 years’ experience working in the industry, strategically managing multi-project low carbon and renewable schemes and frameworks for both private and public sector clients. As a Board Director, he drives creativity and innovation, while ensuring quality and best value for customers. He has a proven track record of achievements supporting clients progress towards the Government’s Net Zero carbon target.


Commercial Leeds


Playhouse Residential


Saxton Gardens Flats


St George’s Lincoln Green House


Flats


Stoney Rock Flats


Ebor Gardens Flats


applications in the autumn of this year. The BEIS delivery body, Salix Finance, manages the Public Sector Decarbonisation Scheme. The Public Sector Low Carbon Skills Fund provides grants for public sector bodies to put in place a heat decarbonisation plan, providing them with information they need to develop future applications to the Public Sector Decarbonisation Scheme. Both the Public Sector Decarbonisation Scheme and the Public Sector Low Carbon Skills Fund are open to public sector bodies in England, and areas of reserved public services across the UK.


STEM Links The Leeds PIPES project is also being used to educate local school children on climate change. The programme also supports a range of National Curriculum and Key Stage themes, such as geography, sustainable development, science, numeracy, and literacy.


n For further information and booking, email leeds.enquiries@veolia.co.uk to get a booking form. The Leeds PIPES website address is: https://www.leeds- pipes.co.uk/


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60