REFURBISHMENT REFURB READY


Jason Tatton , technical service manager at F. Ball and Co. Ltd., advises on preliminary work to achieve optimum results when installing floorcoverings as part of a refurbishment.


The first step in any flooring installation should be to check that subfloors are suitably sound, smooth and dry. When undertaking installations as part of a refurbishment, there will frequently be a number of challenges that you would be less likely to encounter in new-build settings, including contending with subfloors in a poor condition. You never know what you are dealing with until you actually remove old floorcoverings and examine the substrate. Just as when installing floorcoverings anywhere else, flooring contractors need to be aware of the problems posed by the common problem of damp, the leading cause of floor failure.


MOISTURE MANAGEMENT


Excess levels of subfloor moisture can result in moisture rising up and attacking adhesives and floorcoverings, possibly causing complete floor failure. Building regulations introduced in 1965 made it a requirement to install a structural damp- proof course in new buildings, so excess subfloor moisture as a result of rising damp is more likely to be a concern in buildings built before this time.


Even if a damp-proof course is present, contractors should always conduct a moisture test to determine subfloor moisture levels before proceeding to apply subfloor preparation products, not least because the damp-proof course may have been compromised at some point in the building’s history. Where a moisture test indicates that subfloor relative humidity (RH) levels are above 75% (65% if wood floorcovering will be installed), a waterproof surface membrane will be required to suppress excess subfloor moisture levels.


Epoxy waterproof surface membranes are available that will isolate excess subfloor moisture caused by rising damp and residual construction moisture where relative humidity values are up to 98%, with a single coat application, and fully cure in as little as three hours.


DAMAGED SUBFLOORS


Upon removing old floorcoverings, contractors may discover that the subfloor is cracked or damaged. This needs to be addressed before proceeding to the next stages of subfloor preparation. The appearance of cracks should always be investigated to ensure stability and no further movement in case there is an underlying issue that may result in floor failure. Where subfloors are very badly damaged, mechanical repair of the subfloor may be necessary. In most cases, cracks as deep as 50mm can be filled with a repair compound. Some smoothing compounds can also be filled up to 50mm when graded aggregate is added.


It may also be the case that contractors find a sand/cement or calcium sulphate screed has a weak or friable surface – often the result of improper installation or curing techniques.


To avoid having to completely remove a weak or friable sand/ cement screed by mechanical means, it may be possible to treat it using a surface reinforcement system, such as Stopgap SRS, a


32 www.tomorrowscontractfloors.co.uk


two-component epoxy resin reinforcement material designed to quickly stabilise and reinforce weak sand/cement. Contractors simply mix the components thoroughly, pour the mixture over the weak subfloor and spread out with a rubber squeegee, working into the surface until no more liquid is absorbed. Stopgap SRS is fast-acting, meaning weak screeds can be reinforced overnight to provide a base suitable for the installation of subsequent subfloor preparation products.


CONTAMINATION


Old adhesive residues, such as bitumen and carpet tile tackifiers, may also be present after removing old floorcoverings. Traditionally, contractors would have to remove these completely by mechanical means before proceeding. Recent innovations now offer an alternative time-saving solution: as long as adhesive residues are minimal and well bonded, contractors can apply a smoothing underlayment that has been specially formulated for use over old adhesive residues.


Such products were previously only available in bag and bottle formulations. The latest advancements in technology have enabled F. Ball to create a new fast-track, water-mix smoothing underlayment that can be applied over old adhesive residues, Stopgap 1500.


Subfloors may also be contaminated with oil, grease or other chemicals. In this case, the surface will need to be removed using mechanical means before applying other floor preparation products. In the case that the subfloor is very badly contaminated, the screed may need to be completely replaced.


NEXT STEPS


Once the subfloor is suitably sound, smooth and dry, contractors can proceed with the installation of new floorcoverings. Where an isolator membrane has not been used, this should include the application of a suitable smoothing compound to create a perfectly smooth base for the receipt of floorcoverings.


https://f-ball.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40