search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
“Our Woodkirk Yorkshire buff sandstone is a high quality and extremely versatile material that is used in all types of applications ranging from large-scale public projects over a number of years, to building material for commercial and residential properties down to bespoke fireplaces and other stone features,” says Ian.


And he should know what he is talking about, being a skilled sculptor and stone mason himself. “I’ve had a particular association with the quarry here in Morley since I was a four-year- old lad when my father worked here for many years and I did my apprenticeship here. So now, for me to return as Managing Director is a dream come true,” he continues. “Investing in our new EC750E is the way forward and part of our overall strategy to take the business to the next level. We are looking forward to the machine performing well for us in the future!” Calder Masonry Ltd has the sole rights to Woodkirk Stone and is honoured to follow in a proud tradition, extracting stone more than 175 years after the first block was pulled from the same location. The company is one of the largest producers of dimensional Yorkstone in the UK, supplying Woodkirk stone nationwide as well as to the Republic of Ireland. A dedicated management team and a total of 33 employees involved in the day-to-day business of extracting the stone from the quarry and processing it through its on-site factory ensures customers receive a premium product and service. ■


SPECIFICATIONS: 16-litre Stage-III V-ACT engine developing 533 nett hp


A maximum torque of 2570Nm is achieved at just 1350r/min and this, in conjunction with the machine’s advanced hydraulic system, ensures maximum fuel efficiency is achieved through every work cycle.


Calder’s EC750E has been equipped in Mass Excavation configuration complete with:


● Hydraulic coupler ● Heavy-duty 4.4m3 extreme rock bucket ● Heavy-duty ripper tooth


Thus equipped, the EC750E provides: ● Maximum breakout force of 383 kN ● Tearout force of 337kN


The combination of the 6.6m boom and 2.9m dipper arm (mass excavation) gives:


● Maximum reach of 11.46 metres ● Dig depth of 7.2 metres


THE VOICE MAGAZINE No35 2019 31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48