OPERATION & MAINTENANCE OF POWER PLANTS
View of the SPGr being installed in the side wall of the horizontal pass boiler
ADVANCED CLEANING TECH
Mirek Spicar reveals how a Swiss WtE plant relies on the latest technology for boiler cleaning
R
energia Luzern has gained the best operating experience with boiler cleaning by means of Shock Pulse Generators (SPG) and finally decided to upgrade the entire plant with the latest development of this technology.
A BRIEF OVERVIEW OF THE REQUIREMENTS Te Renergia Luzern WtE plant consists of two parallel lines, which were commissioned in 2015. Te plant concept was designed for a capacity of 58 t/h steam at 410°C/41 bar for each of the boilers. As the WtE plant is located on the site of a paper mill, steam production was primarily focused on the generation of electricity and industrial steam. Te low-pressure steam was used to supply district heating to a nearby residential area. Additional energy was required as district heating was gradually expanded to other areas. An increase to the current 2 x 70 t/h was only an option if the boiler would remain clean throughout the entire operating period.
LONG-TERM EXPERIENCE WITH THE SETUP
Te operator decided to work closely with Explosion Power - which has
22
www.engineerlive.com
commercialised over 1,000 units worldwide to date – to optimise boiler cleaning using an automated system from the latest development of SPGs. Te four-pass boiler consists of three vertical passes and one horizontal pass. Proven experience with the initial development of the SPG series in the vertical passes, which at the time operated on natural gas and pure oxygen, encouraged the operator to continue the expansion with the updated SPGr series, which requires less maintenance and uses compressed air instead of oxygen for operation.
SATISFACTION WITH THE SYSTEM Since August 2021, three SPGr units per boiler have been installed in the horizontal pass. Te task is to clean the convection evaporator and superheaters to minimise the pressure drop across the bundles and to keep the temperature of the last superheater below 625°C, i.e., to keep the bundles clean. All requirements are well met. Te shock pulses (SP) – lasting for few milliseconds only – are generated sequentially about twice per
hour. Te SPGr are fed by a stoichiometric ratio of a few grams of natural gas and compressed air. After having only positive experience with the SPGr, the operator decided to replace the originally installed SPG in the vertical passes with the equivalent SPGr. Te WtE plant is now equipped with a total of 12 SPGr units of the same type. All functions are generated automatically, and steam production remains at a constant level throughout the operating period. Each boiler operates for two years without manual cleaning. Te chief maintenance manager,
Markus Benz summarises as follows: “Te SPGr are reliable, easy to operate and cost-effective.”
Graphics of the four-pass boiler showing the position of the SPGs being installed in the side wall of the horizontal pass boiler
Mirek Spicar is with Explosion Power.
www.explosionpower.ch
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52